Highline School District - Pacific Middle School Replacement: MACC I Bid Packages, Des Moines, WA - Addendum #2    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 54 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Addendum #2
Page 6 Exhibit A Scope of Work / Supply and Clarifications / Qualifications
Page 12 Bid Form - BP 02A - Building Demolition and Abatement
Page 17 Bid Form - BP 26A - Early Works Electrical
Page 21 Bidder Questions and Answers
Page 24 Section 232113.33 Ground Loop Heat Pump Piping
Page 31 Section 263600 Transfer Switches
Page 39 Section 262410 Service Entrance
Page 43 Section 262413 Switchboards
Page 49 Section 262813 Overcurrent Protective Devices