Lake Washington School District HS Additions - Eastlake High School: MACC I Bid Packages, Sammamish, WA - 2011 Conformed Plans Volume 1
G0.10 Project Information Sheet & Index of Drawings
G0.11 General Legend & Abbreviations
Sheet 1 Boundary & Topographic Survey
Sheet 2 Boundary & Topographic Survey
Sheet 3 Boundary & Topographic Survey
Sheet 4 Boundary & Topographic Survey
Sheet 5 Boundary & Topographic Survey
Sheet 6 Boundary & Topographic Survey
Sheet 7 Boundary & Topographic Survey
C0.00-2 Cover Sheet
C0.01-2 Notes Sheet
C1.00-2 Overall Demolition and TESC Plan
C1.01-2 Demolition and TESC Plan
C1.02-2 Demolition and TESC Plan
C2.00-2 Overall Grading and Drainage Plan
C2.01-2 Grading, Drainage and Utility Plan
C2.02-2 Grading, Drainage and Utility Plan
C1.00-3 Overall Demolition and TESC Plan
C1.02-3 Demolition and TESC Plan
C1.03-3 Demolition and TESC Plan
C1.04-3 Demolition and TESC Plan
C2.00-3 Overall Grading, Drainage, and Utility Plan
C2.01-3 Grading, Drainage and Utility Plan
C2.02-3 Grading, Drainage and Utility Plan
C2.03-3 Grading, Drainage and Utility Plan
C2.04-3 Grading, Drainage and Utility Plan
C3.00-3 Overall Horizontal Control Plan
C3.01-3 Horizontal Control Plan
C3.02-3 Horizontal Control Plan
C3.03-3 Horizontal Control Plan
C3.04-3 Horizontal Control Plan
C4.00-3 Overall Paving Plan
C4.01-3 Paving Plan
C4.02-3 Paving Plan
C4.03-3 Paving Plan
C4.04-3 Paving Plan
C4.05-3 Overall Access and Channelization Plan
C5.00 Temporary Erosion Control Details
C5.01 Temporary Erosion Control Details
C5.10 Drainage Details
C5.11 Drainage Details
C5.20 Paving Details
C5.21 Paving Details
C5.22 Striping and Signage Details
C5.30 Site Sections
C6.00 233rd Avenue NE Overall Plan
C6.10 233rd Avenue NE Demolition and TESC Plan
C6.11 233rd Avenue NE Demolition and TESC Plan
C6.12 233rd Avenue NE Demolition and TESC Plan
C6.13 233rd Avenue NE TESC Details
C6.15 233rd Avenue NE Grading, Drainage, and Utility Plan
C6.16 233rd Avenue NE Grading, Drainage, and Utility Plan
C6.17 233rd Avenue NE Grading, Drainage, and Utility Plan
C6.18 233rd Avenue NE Paving and Channelization Plan
C6.19 233rd Avenue NE Paving and Channelization Plan
C6.20 233rd Avenue NE Paving and Channelization Plan
C6.21 233rd Avenue NE Site Details
C6.22 233rd Avenue NE Site Details
L1.01 Hardscape Plan
L1.02 Hardscape Plan
L1.03 Hardscape Plan
L1.04 Hardscape Plan
L1.05 Hardscape Plan
L1.06 Hardscape Plan
L2.01 Irrigation Plan
L2.02 Irrigation Plan
L2.03 Irrigation Plan
L2.04 Irrigation Plan
L2.05 Irrigation Plan
L2.06 Irrigation Plan
L2.07 Irrigation Schedule / Details
L3.01 Planting Plan
L3.02 Planting Plan
L3.03 Planting Plan
L3.04 Planting Plan
L3.05 Planting Plan
L3.06 Planting Plan
L3.07 Planting Schedule / Details
L4.01 Tree Retention Plan
L4.02 Tree Retention Plan
L4.03 Tree Retention Plan
L4.04 Tree Retention Plan
L4.05 Tree Retention Plan
L4.06 Tree Retention Plan
L5.01 Hardscape Details
W1.0 Existing Conditions
W2.0 Proposed Site Plan Impacts and Mitigation
W3.0 Area A Planting Plan, Plant Installation Specifications & Details
W3.1 Area B Grading and Planting Plans
W4.0 Mitigation Plan Notes and Construction Sequence
S1.1 General Structural Notes
S1.2 General Structural Notes
S2.1 Unit A - First Floor Plan
S2.2 Unit A - Second Floor Framing Plan
S2.3 Unit A - Equipment Platform & Low Roof Framing Plan
S2.4 Unit A - High Roof Framing Plan
S2.5 Unit B - First Floor Plan
S2.6 Unit B - Second Floor Framing Plan
S2.7 Unit C - Lower Floor Plan
S2.8 Unit C - First Floor Framing Plan
S2.9 Unit C - Roof Framing Plan
S3.1 Typical Concrete Details
S3.2 Foundation Details
S3.3 Foundation Details
S5.1 Typical Metal Deck Details
S5.2 Typical Steel Details
S5.3 Steel Details
S5.4 Steel Details
S5.5 Steel Details
S5.6 Steel Details
S6.1 Braced Frame Elevations
S6.2 Braced Frame Details
S6.3 Braced Frame Details
S7.1 Typical Metal Stud Details
A0.10 Site Plan / Planning Analysis / Fire-Flow Calculation
A0.11 Enlarged Site Plans / Site Details
A0.12 Site Details
A0.20 Code Summary
A0.21 Code Summary
A0.22 Wall Types & Construction Assemblies
A0.23 Typical Details
A0.24 Seismic Expansion Joint Details
A0.25 Unit A Fireproofing Plans
A0.26 Unit B Fireproofing Plans
A0.27 Unit C Fireproofing Plans
A0.30 Overall Lower Floor Plan
A0.31 Overall First Floor Plan
A0.32 Overall Second Floor Plan / Unit A - Mechanical Equipment Platform
A0.33 Overall Roof Plan
A0.40 Construction Sequence Plan - Site & First Floor
A0.41 Construction Sequence Plan - Lower Floor & Second Floor
AD.10 Unit A - First & Second Floor Demolition Plans
AD.11 Unit B - First Floor Demolition Plan
AD.12 Unit B - Second Floor Demolition Plan
AD.13 Unit C - Lower & First Floor Demolition Plans
AD.14 Unit A - First & Second Floor Demolition Reflected Ceiling Plans
AD.15 Unit B - First Floor Demolition Reflected Ceiling Plan
AD.16 Unit B - Second Floor Demolition Reflected Ceiling Plan
AD.17 Unit C - Lower Floor Demolition Reflected Ceiling Plan
A1.10 Unit A - First Floor Architectural Plan
A1.11 Unit A - Second Floor Architectural Plan
A1.12 Unit A - Equipment Platform Architectural Plan
A1.13 Unit B - First Floor Architectural Plan
A1.14 Unit B - Second Floor Architectural Plan
A1.15 Unit C - Lower Floor Architectural Plan
A1.16 Unit C - First Floor Architectural Plan
A1.17 Plan Details
A1.18 Plan Details
A1.19 Plan Details
A1.20 Unit A - First Floor Finish Plan
A1.21 Unit A - Second Floor Finish Plan
A1.22 Unit A - Equipment Platform Finish Plan
A1.23 Unit B - First Floor Finish Plan
A1.24 Unit B - Second Floor Finish Plan
A1.25 Unit C - Lower Floor Finish Plan
A1.26 Unit C - First Floor Finish Plan
A1.30 Unit A First Floor Equipment Plan
A1.31 Unit A Second Floor Equipment Plan
A1.32 Unit A Equipment Platform Equipment Plan
A1.33 Unit B First Floor Equipment Plan
A1.34 Unit B Second Floor Equipment Plan
A1.35 Unit C Lower Level Equipment Plan
A1.36 Unit C First Floor Equipment Plan
A1.37 Equipment Details
A1.38 Educational Casework Schedule
A1.39 Mounting Height Drawing / Enlarged Toilet Plans / Equipment Details
A1.40 Unit A First Floor Reflected Ceiling Plan
A1.41 Unit A Second Floor Reflected Ceiling Plan
A1.42 Unit A Equipment Platform Reflected Ceiling Plan / Ceiling Details
A1.43 Unit B First Floor Reflected Ceiling Plan
A1.44 Unit B Second Floor Reflected Ceiling Plan
A1.45 Unit C Lower Level Reflected Ceiling Plan
A1.46 Unit C First Floor Reflected Ceiling Plan
A1.47 Ceiling Details
A1.48 Ceiling Details
A1.50 Unit A Signage Plans
A1.51 Unit B & C Signage Plans
A1.52 Unit A & B Teachability Sign Text
A2.10 Unit A - Roof Plan
A2.11 Unit C - Roof Plan
A2.12 Roof Details
A2.13 Roof Details
A3.10 Unit A - Building Elevations
A3.11 Unit C - Building Elevations
A3.12 Exterior Details
A4.10 Unit A - Building Sections
A4.11 Unit B - Building Sections
A4.12 Unit C - Building Sections
A5.10 Unit A Wall Sections
A5.11 Unit A Wall Sections
A5.12 Unit A Wall Sections
A5.13 Unit A Wall Sections
A5.14 Unit A Wall Sections
A5.15 Unit A Wall Sections
A5.16 Unit B Wall Sections
A5.17 Unit B Wall Sections
A5.18 Unit C Wall Sections
A5.19 Unit C Wall Sections
A5.20 Unit C Wall Sections
A6.10 Vertical Circulation
A6.11 Vertical Circulation
A6.12 Vertical Circulation
A6.13 Vertical Circulation
A6.14 Vertical Circulation
A6.15 Vertical Circulation
A6.16 Vertical Circulation
A6.17 Vertical Circulation
A6.18 Vertical Circulation
A7.10 Interior Elevations
A7.11 Interior Elevations
A7.12 Interior Elevations
A7.13 Interior Elevations
A7.14 Interior Elevations
A7.15 Interior Elevations
A7.16 Interior Elevations
A7.17 Interior Elevations
A8.10 Doors & Door Frames
A8.11 Window & Storefront Frames
A8.12 Curtain Wall & Metal Wall Louver Frames
A8.13 Door Frame Details
A8.14 Window & Storefront Details
A8.15 Curtain Wall & Metal Wall Louver Details
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.