Highline School District - Pacific Middle School Replacement: MACC 2 Early Bid Packages, Des Moines, WA - Specs Volume 1    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 212 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Project Team
Page 7 Section 000003 Table of Contents
Page 15 Section 011000 Summary of Work
Page 24 Section 011101 Summary of Hazardous Materials Work
Page 30 Section 012100 Allowances
Page 33 Section 012200 Unit Prices
Page 35 Section 012300 Alternates
Page 37 Section 012500 Substitution Procedures
Page 40 Section 012500a Substitution Request Form (Prior to Bidding)
Page 42 Substitution Request (After the Bidding / Negotiating Phase)
Page 44 Section 012600 Contract Modification Procedures
Page 47 Architect's Supplemental Instructions
Page 48 Change Order Proposal
Page 49 Construction Change Directive
Page 50 Section 012900 Payment Procedures
Page 56 Section 013100 Project Management and Coordination
Page 67 Section 013200 Contract Modification Procedures
Page 74 Section 013233 Photographic Documentation
Page 78 Section 013300 Submittal Procedures
Page 87 Section 013565 Sustainable Design Requirements for WSSP
Page 94 Section 013565 WSSP 2023 Product Submittal Form
Page 97 Section 013573 Delegated Design Procedures
Page 101 Section 014000 Quality Requirements
Page 109 Section 014150 Air Barrier System Quality Control Testing Requirements
Page 115 Section 014339 Mockups
Page 121 Section 015000 Temporary Facilities and Controls
Page 133 Section 015639 Temporary Tree & Plant Protection
Page 137 Section 015700 Temporary Erosion Control
Page 146 Section 015721 Indoor Air Quality Controls
Page 150 Section 016000 Product Requirements
Page 156 Section 017300 Execution
Page 168 Section 017419 Construction Waste Management and Disposal
Page 178 Section 017700 Closeout Procedures
Page 183 Section 017823 Operation and Maintenance Data
Page 190 Section 017836 Warranties
Page 193 Section 017839 Project Record Documents
Page 196 Section 017900 Demonstration and Training
Page 200 Section 019113 General Commissioning Requirements