Highline School District - Pacific Middle School Replacement: MACC 2 Bid Packages, Des Moines, WA - Bid Package 26B - Electrical    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 347 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Content Index
Page 4 Section 00020 Instructions to Bidders
Page 10 Bid Form
Page 16 Exhibit A Scope of Work / Supply and Clarifications / Qualifications
Page 31 Exhibit A.2 Scope Allocations (Under Separate Cover)
Page 32 Exhibit A.3 BIM Execution Plan
Page 41 Exhibit B Drawings, Specifications, Addenda and Reference Documents
Page 60 Exhibit C Alternates, Unit Prices, and Labor Rates
Page 65 Exhibit D Project Schedule / Milestones
Page 66 Exhibit D.1 Project Schedule
Page 91 Exhibit E Standard Subcontract Terms and Conditions
Page 110 Exhibit F Supplier Code of Conduct
Page 119 Exhibit G Standard Insurance Requirements
Page 130 Exhibit H Interim Estimate for Payment, Waiver and Release
Page 132 Exhibit I Final Estimate for Payment, Unconditional Waiver and Release
Page 135 Exhibit J Standard Subcontractor Environmental Health and Safety Requirements
Page 139 Exhibit K Standard Change Order
Page 141 Exhibit M Project Specific Requirements
Page 155 Exhibit N Supplemental Terms and Conditions to Subcontract for Use in the State of Washington
Page 163 Exhibit O Performance Bond
Page 165 Payment Bond
Page 167 Exhibit PS-1 Owner / Contractor Agreement
Page 168 AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor
Page 207 AIA Document A133-2019 Exhibit A Guaranteed Maximum Price Amendment
Page 211 Exhibit B Cost Responsibility Matrix
Page 214 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 291 Exhibit PS-2 Environmental Health and Safety Plan Updates
Page 292 Exhibit R Quality Management Program
Page 296 Exhibit S Authorized Signatories
Page 297 Exhibit T1 Supplier Diversity Program Summary
Page 299 Exhibit T2 Instructions to Bidders
Page 300 Exhibit T3 Diverse Business Status Verification
Page 303 Exhibit U Sub-Subcontractor Identification
Page 305 Exhibit X Site Requirements
Page 318 Exhibit X.1 Site and Demolition Logistics Plan
Page 327 Exhibit X.2 Paving Plan
Page 329 Exhibit X.3 Temporary Power and Lighting
Page 333 Exhibit X.4 Temporary Heat Plan (Under Separate Cover)
Page 334 Exhibit X.5 Temporary Garage Door Plan
Page 338 Exhibit X.6 Delivery Request Form
Page 340 Exhibit X.7 PlanIt for Construction Work Plan Development
Page 345 Exhibit Y Supplemental Terms and Conditions for Subcontractors / Sellers with Design Responsibility