Highline School District - Pacific Middle School Replacement: MACC 2 Bid Packages, Des Moines, WA - Specs Volume 1    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 215 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Project Team
Page 7 Section 000003 Table of Contents
Page 15 Section 011000 Summary of Work
Page 24 Section 011101 Summary of Hazardous Materials Work
Page 30 Section 012100 Allowances
Page 33 Section 012200 Unit Prices
Page 35 Section 012300 Alternates
Page 37 Section 012500 Substitution Procedures
Page 40 Substitution Request Form (Prior to Bidding)
Page 42 Substitution Request (After the Bidding /Negotiating Phase)
Page 44 Section 012600 Contract Modification Procedures
Page 47 Architect's Supplemental Instructions
Page 48 Change Order Proposal
Page 49 Construction Change Directive
Page 50 Change Order
Page 51 Section 012900 Payment Procedures
Page 57 Section 013100 Project Management & Coordination
Page 68 Section 013200 Contract Modification Procedures
Page 75 Section 013233 Photographic Documentation
Page 79 Section 013300 Submittal Procedures
Page 88 Section 013565 Sustainable Design Requirements for WSSP
Page 95 WSSP 2023 Scorecard
Page 97 WSSP 2023 Product Submittal Form
Page 100 Section 013573 Delegated Design Procedures
Page 104 Section 014000 Quality Requirements
Page 112 Section 014150 Air Barrier System Quality Control Testing Requirements
Page 118 Section 014339 Mockups
Page 124 Section 015000 Temporary Facilities & Controls
Page 136 Section 015639 Temporary Tree & Plant Protection
Page 140 Section 015700 Temporary Erosion Control
Page 149 Section 015721 Indoor Air Quality Controls
Page 153 Section 016000 Product Requirements
Page 159 Section 017300 Execution
Page 171 Section 017419 Construction Waste Management & Disposal
Page 181 Section 017700 Closeout Procedures
Page 186 Section 017823 Operation & Maintenance Data
Page 193 Section 017836 Warranties
Page 196 Section 017839 Project Record Documents
Page 199 Section 017900 Demonstration & Training
Page 203 Section 019113 General Commissioning Requirements