Lake Washington School District HS Additions - Redmond High School Addition: MACC 1 Bid Packages, Redmond, WA - Addendum #1 As-Builts - 2001 Plans Volume 3
Cover Sheet
K1 Kitchen / Snack Bar Equipment Plans
K2 Kitchen Equipment Schedule & Serving Elevations
K3 Kitchen / Snack Bar Equipment Rough-In Plans
K4 Kitchen Equipment Refrigeration System
K5 Kitchen Equipment Ventilator / U.D.S. Details
K6 Kitchen Equipment Elevations & Details
TR2.1 Theatre Rigging Plan
TR2.2 Drama / Choir Classroom Rigging Plan
TR3.1 Theatre Rigging Section & Elevation
TR10.1 Theatre Rigging Details
TS2.1 Theatre Seating Plan
ET0.1 Theatre Electrical Riser Diagram & Schedule
ET0.2 Theatre Electrical Risers
ET2.1 Theatre Electrical Device Locations
ET2.2 Theatre Electrical Device Locations
ET2.3 Great Hall Electrical Device Locations
ET7.1 Theatre Electrical Device Details
ET7.2 Theatre Electrical Device Details
ET7.3 Theatre Electrical Device Details
P1.01 Plumbing Schedules & Legends
P1.02 Plumbing Schedules & Details
P1.03 Loop Field Site Plan
P2.01 Foundation Plumbing Plan - Gymnasium, Locker Rooms
P2.02 Foundation Plumbing Plan - Great Hall, Kitchen
P2.03 Foundation Plumbing Plan - NW Classroom Cluster
P2.04 Foundation Plumbing Plan - Science
P2.05 Foundation Plumbing Plan - Library
P2.06 Foundation Plumbing Plan - HTLC, SPCL ED, PS, SE Classroom Cluster
P2.07 Foundation Plumbing Plan - Administration, Counseling, Drama
P2.08 Foundation Plumbing Plan - Performing Arts, Art
P3.01 First Floor Plumbing Plan - Gymnasium, Locker Rooms
P3.02 First Floor Plumbing Plan - Great Hall, Kitchen
P3.03 First Floor Plumbing Plan - NW Classroom Cluster
P3.04 First Floor Plumbing Plan - Science
P3.05 First Floor Plumbing Plan - Library
P3.06 First Floor Plumbing Plan - HTLC, SPCL ED, PS, SE Classroom Cluster
P3.07 First Floor Plumbing Plan - Administration, Counseling, Drama
P3.08 First Floor Plumbing Plan - Performing Arts, Art
P3.13 Second Floor Plumbing Plan - NW Classroom Cluster
P3.14 Second Floor Plumbing Plan - Science
P3.15 Second Floor Plumbing Plan - Library
P3.16 Second Floor Plumbing Plan - SE Classroom Cluster
P4.01 Enlarged Plumbing Plans
P4.02 Second Floor Plumbing Plan - SE Classroom Cluster
P5.01 Plumbing Details
P5.02 Plumbing Details
P6.01 Stadium Services & Green House Plumbing / Waste
M1.01 Mechanical Legend & Schedules
M1.02 Mechanical Schedules
M1.03 Mechanical Schedules
M2.01 First Floor Reflected Ceiling Plan - Gymnasium, Locker Rooms
M2.02 First Floor Reflected Ceiling Plan - Great Hall, Kitchen
M2.03 First Floor Reflected Ceiling Plan - NW Classroom Cluster
M2.04 First Floor Reflected Ceiling Plan - Science
M2.05 First Floor Reflected Ceiling Plan - Library
M2.06 First Floor Reflected Ceiling Plan - HTLC, SPCL ED, PS, SE Classrooms
M2.07 First Floor Reflected Ceiling Plan - Administration, Counseling, Drama
M2.08 First Floor Reflected Ceiling Plan - Performing Arts, Art
M2.13 Second Floor Reflected Ceiling Plan - NW Classroom Cluster
M2.14 Second Floor Reflected Ceiling Plan - Science
M2.15 Second Floor Reflected Ceiling Plan - Library
M2.16 Second Floor Reflected Ceiling Plan - SE Classroom Cluster
M3.01 First Floor Furred Ceiling Plan - Gymnasium, Locker Rooms
M3.02 First Floor Furred Ceiling Plan - Great Hall, Kitchen
M3.03 First Floor Furred Ceiling Plan - NW Classroom Cluster
M3.04 First Floor Furred Ceiling Plan - Science
M3.05 First Floor Furred Ceiling Plan - Library
M3.06 First Floor Furred Ceiling Plan - HTLC, SPCL ED, PS, SE Classrooms
M3.07 First Floor Furred Ceiling Plan - Administration, Counseling, Drama
M3.08 First Floor Furred Ceiling Plan - Performing Arts, Art
M3.13 Second Floor Furred Ceiling Plan - NW Classroom Cluster
M3.14 Second Floor Furred Ceiling Plan - Science
M3.15 Second Floor Furred Ceiling Plan - Library
M3.16 Second Floor Furred Ceiling Plan - SE Classroom Cluster
M3.22 Attic Level Mechanical Plan - Kitchen
M3.23 Attic Level Mechanical Plan - NW Classroom Cluster
M4.01 Custom AHU Details
M4.02 Custom AHU Details
M4.03 Custom AHU Details
M5.01 Mechanical Details
M5.02 Mechanical Details
M6.01 Stadium Services & Green House Mechanical Plan
M7.01 Mechanical Building Sections
M7.02 Mechanical Building Sections
M7.03 Mechanical Building Sections
E0.01 Electrical Legend
E0.02a Fixture Schedule
E0.02b Fixture Schedule - Continued
E0.03 Mechanical Equipment Schedules
E1.01 Electrical Site Plan - Power
E1.02 Stadium Services Building (Deductive Alternate Bid #8)
E1.03 Greenhouse Building
E1.04 Electrical Site Lighting Plan
E1.05 Electrical Site Details
E1.06 Electrical Site Enlarged Plans
E1.10 Electrical Street Lighting Plan
E1.11 Electrical Diagrams & Details
E2.01 First Floor Lighting Plan - Gymnasium, Locker Rooms
E2.02 First Floor Lighting Plan - Great Hall, Kitchen
E2.03 First Floor Lighting Plan - NW Classroom Cluster
E2.04 First Floor Lighting Plan - Science
E2.05 First Floor Lighting Plan - Library
E2.06 First Floor Lighting Plan - SE Classroom Cluster
E2.07 First Floor Lighting Plan - Administration, Counseling, Drama
E2.08 First Floor Lighting Plan - Performing Arts, Art
E2.13 Second Floor Lighting Plan - NW Classroom Cluster
E2.14 Second Floor Lighting Plan - Science
E2.15 Second Floor Lighting Plan - Library
E2.16 Second Floor Lighting Plan - SE Classroom Cluster
E2.21 Lighting Attic Floor Plan - Sector G
E2.22 Lighting Attic Floor Plan - Sector F
E2.23 Lighting Attic Floor Plan - Sector E
E3.01 First Floor Power Plan - Gymnasium, Locker Rooms
E3.02 First Floor Power Plan - Great Hall, Kitchen
E3.03 First Floor Power Plan - NW Classroom Cluster
E3.04 First Floor Power Plan - Science
E3.05 First Floor Power Plan - Library
E3.06 First Floor Power Plan - SE Classroom Cluster
E3.07 First Floor Power Plan - Administration, Counseling, Drama
E3.08 First Floor Power Plan - Performing Arts, Art
E3.13 Second Floor Power Plan - NW Classroom Cluster
E3.14 Second Floor Power Plan - Science
E3.15 Second Floor Power Plan - Library
E3.16 Second Floor Power Plan - SE Classroom Cluster
E3.21 Power Attic Floor Plan - Sector G
E3.22 Power Attic Floor Plan - Sector F
E3.23 Power Attic Floor Plan - Sector E
E4.01 First Floor Systems Plan - Gymnasium, Locker Rooms
E4.02 First Floor Systems Plan - Great Hall, Kitchen
E4.03 First Floor Systems Plan - NW Classroom Cluster
E4.04 First Floor Systems Plan - Science
E4.05 First Floor Systems Plan - Library
E4.06 First Floor Systems Plan - SE Classroom Cluster
E4.07 First Floor Systems Plan - Administration, Counseling, Drama
E4.08 First Floor Systems Plan - Performing Arts, Art
E4.13 Second Floor Systems Plan - NW Classroom Cluster
E4.14 Second Floor Systems Plan - Science
E4.15 Second Floor Systems Plan - Library
E4.16 Second Floor Systems Plan - SE Classroom Cluster
E4.21 Systems Attic Floor Plan - Sector G
E4.22 Systems Attic Floor Plan - Sector F
E4.23 Systems Attic Floor Plan - Sector E
E5.01 Partial Electrical Plans - Performing Arts
E5.02 Partial Electrical Plans - Performing Arts
E5.03 Partial Electrical Plans - Performing Arts
E5.04 Partial Electrical Plans - Performing Arts
E5.05 Partial Electrical Plans - Performing Arts
E5.06 Partial Electrical Plans - Performing Arts
E5.07 Enlarged Snack Bar & Kitchen Floor Plan
E5.08 Enlarged First Floor Power Plan - Gymnasium Mechanical Room
E6.01 Power Riser Diagram #1
E6.02 Power Riser Diagram #2
E6.03 Panel Schedules
E6.04 Panel Schedules
E6.05 Panel Schedules
E6.06 Panel Schedules
E6.07 Panel Schedules
E6.08 Panel Schedules & Load Calculations
E6.09 Load Calculations
E7.01 System One-Line Diagrams & Details
E7.02 One-Line Diagrams & Details
E7.03 Details
E7.04 Details
E7.05 Details & Wiring Diagrams
E7.06 Details & Wiring Diagram
E7.07 Data / Voice One-Line Diagram
E7.08 Details
ES-1 Performing Arts Center Sound System
ES-2 Performing Arts Center Sound System Details
ES-3 Gymnasium Sound System
ES-4 Great Hall Sound System
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.