This document has 403 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Request for Final Proposals (RFFP)
Page 3 Section 002213 Request for Final Proposal (RFFP) for GC/CM Services
Page 10 Section 004400 RFFP Final Proposal Form
Page 14 Section 005000 Modified AIA Document A133-2019 Standard Form of Agreement Between Owner & Construction Manager as Constructor
Page 15 Section 005001 Exhibit A Modified AIA Document A133-2019 Guaranteed Maximum Price Amendment
Page 16 Section 005002 Attachment No. 1 Cost Responsibility Matrix
Page 32 Section 005003 Attachment No. 2 Form of Construction Cost Estimate
Page 34 Section 005004 Attachment No. 3 Form of Construction Cost Summary
Page 36 Section 005005 Attachment No. 4 Listing of Contract Documents
Page 38 Section 005006 Attachment No. 5 List of Negotiated Support Services
Page 40 Section 005007 Attachment A1 Scope of Work for Preconstruction Services
Page 50 Section 005008 Attachment A2 GC/CM Preconstruction Work Plan
Page 52 Section 005009 Attachment B Insurance Requirements
Page 53 Section 005010 Attachment C Prevailing Wage Rates Information Washington State Department of Labor & Industries
Page 54 Section 007200 General Conditions of the Contract for Construction
Page 55 Division 01 General Requirements
Page 56 Section 011100 Summary of Work
Page 62 Section 012300 Alternates
Page 63 Section 012500 Substitutions
Page 67 Section 012600 Contract Modifications
Page 71 Section 012976 Progress Payments
Page 83 Section 013100 Project Management Coordination
Page 92 Section 013119 Project Meetings
Page 99 Section 013216 Construction Schedule
Page 107 Section 013300 Submittal Procedures
Page 115 Section 013523 Safety Requirements
Page 124 Section 014100 Air Barrier System
Page 131 Section 014200 References
Page 135 Section 014500 Contractor Quality Control
Page 138 Section 014523 Testing & Inspection
Page 143 Section 014554 Air Barrier Testing & Air Leak Mitigation
Page 149 Section 015000 Temporary Facilities & Controls
Page 164 Section 015639 Temporary Tree Protection Plan
Page 168 Section 015800 Project Identification
Page 170 Section 017123 Field Engineering
Page 173 Section 017300 Execution
Page 183 Section 017339 Cutting & Patching
Page 186 Section 017400 Construction Waste Management
Page 191 Section 017500 Test Engineer Services
Page 197 Section 017700 Closeout Procedures
Page 207 Section 017823 Operation & Maintenance Data
Page 208 Installation Instructions or Operations & Maintenance Manual
Page 213 Section 017836 Warranties
Page 216 Section 017900 Demonstration & Training
Page 220 Section 019100 Commissioning
Page 228 Appendix A Divisions 00 & 01 Forms
Page 229 Table of Contents
Page 231 Substitution Request Form
Page 232 Proposal Request
Page 233 Contract Change Order
Page 234 PR / COP Breakdown Summary GC / CM
Page 235 PR / COP Subcontractor Breakdown Summary GCCM
Page 236 PR Cost Breakdown
Page 238 PW Wage Rates
Page 239 PR Equipment Rates
Page 240 Construction Change Directive
Page 241 Physical Completion of Public Works Project
Page 242 Application & Certificate for Payment
Page 243 Schedule of Values
Page 244 Monthly Subcontractors List & Certifications
Page 245 Statement of Intent to Pay Prevailing Wages & Affidavit of Wages Paid Information
Page 246 Certificate of Payment of Labor & Materials
Page 247 Request for Information
Page 248 Notice of Non-Compliance
Page 249 Short Interval Schedule
Page 250 Building Model Use Agreement
Page 251 Letter of Transmittal
Page 252 Contractor Quality Control Daily Report
Page 254 Utility Shutdown Request
Page 255 Sample Project Identification Sign
Page 256 Specifications - Mechanical & Electrical Engineers
Page 257 Table of Contents
Page 258 Section 230000 Heating, Ventilating & Air Conditioning (HVAC) Basic Requirements
Page 268 Section 230519 Meters & Gauges for HVAC Piping
Page 273 Section 230523 General-Duty Valves for HVAC Piping
Page 278 Section 230553 Identification for HVAC Piping, Ductwork & Equipment
Page 282 Section 232113 HVAC Piping
Page 287 Section 232113.33 Ground-Loop Heat-Pump Piping
Page 300 Section 232116 Hydronic Piping Specialties
Page 302 Section 232500 HVAC Water Treatment
Page 307 Section 260000 Electrical Basic Requirements
Page 318 Section 260533 Raceways
Page 326 Section 260543 Electrical Vaults & Underground Raceways
Page 334 Cover Page
Page 335 A/E Stamp / Signature Pages
Page 337 Section 000010 Table of Contents
Page 339 Section 071900 Water Repellents
Page 344 Section 079200 Joint Sealants
Page 350 Section 311000 Site Clearing
Page 356 Section 312000 Earth Moving
Page 364 Section 312319 Dewatering
Page 368 Section 312500 Erosion & Sediment Control
Page 376 Section 334116 Subdrainage Piping
Page 378 Specifications - Landscape Architect
Page 379 Table of Contents
Page 380 Section 328400 Temporary Irrigation (Design Build)
Page 384 Section 329113 Soil Preparation
Page 392 Section 329300 Plants