Renton High School Replacement - MACC 02, Renton, WA - Addendum #3 Plans
C1.30-4 Cover Sheet
C1.31-4 Sheet Index & Schedule of Alternates
C2.31-4 Demolition Plan
C2.33-4 Demolition Plan
C2.34-4 Demolition Plan
C2.35-4 Demolition Plan
C2.36-4 Demolition Plan
C2.37.4 Demolition Plan
C2.39.4 Demolition Plan
C2.43-4 Demolition Plan
C3.34-4 TESC Plan
C3.43-4 TESC Plan
C4.31-4 Grading & Drainage Plan
C4.32-4 Grading & Drainage Plan
C4.34-4 Grading & Drainage Plan
C4.35-4 Grading & Drainage Plan
C4.36-4 Grading & Drainage Plan
C4.37-4 Grading & Drainage Plan
C4.38-4 Grading & Drainage Plan
C4.39-4 Grading & Drainage Plan
C4.40-4 Grading & Drainage Plan
C4.41-4 Grading & Drainage Plan
C4.42-4 Grading & Drainage Plan
C4.43-4 Grading & Drainage Plan
C4.50-4 Site Grading Details
C4.51-4 Site Grading Details
C4.52-4 Site Grading Details
C4.61-4 Drainage Profiles
C4.62-4 Drainage Profiles
C4.63-4 Drainage Profiles
C4.64-4 Drainage Profiles
C4.65-4 Drainage Profiles
C4.66-4 Drainage Profiles
C5.31-4 Water Plan & Profile
C5.32-4 Water Plan & Profile
C5.33-4 Water Plan & Profile
C5.34-4 Water Plan & Profile
C5.35-4 Water Plan & Profile
C5.36-4 Water Plan & Profile
C5.37-4 Water Plan & Profile
C5.38-4 Water Plan & Profile
C5.39-4 Water Plan & Profile
C5.41-4 Sanitary Sewer Plan & Profile
C5.42-4 Sanitary Sewer Plan & Profile
C5.43-4 Sanitary Sewer Plan & Profile
C6.31-4 Surfacing & Horizontal Control Plan
C6.34-4 Surfacing & Horizontal Control Plan
C6.35-4 Surfacing & Horizontal Control Plan
C6.36-4 Surfacing & Horizontal Control Plan
C6.39-4 Surfacing & Horizontal Control Plan
C6.42-4 Surfacing & Horizontal Control Plan
C6.43-4 Surfacing & Horizontal Control Plan
C7.32-4 Notes & Details
C7.33-4 Notes & Details
C7.35-4 Notes & Details
C7.37-4 Notes & Details
C7.42-4 Notes & Details
C7.45-4 Notes & Details
C7.49-4 Notes & Details
C7.50-4 Notes & Details
C7.51-4 Notes & Details
C7.52-4 Notes & Details
C8.31-4 Airport Way Improvements
C8.32-4 Airport Way Improvements
C8.33-4 Shattuck Avenue South Improvements
C8.35-4 Logan Avenue South Improvement
C8.36-4 Logan Avenue South Improvement
C8.37-4 Logan Avenue South Improvement
C8.38-4 Logan Avenue South Improvement
C8.39-4 South Tobin Street Improvements
C8.41-4 Intersection Details
C8.42-4 Intersection Details
C8.43-4 Intersection Details
C8.51-4 Roadway Sections
C8.52-4 Roadway Sections
C8.61-4 Channelization Plan - Airport Way
C8.63-4 Channelization Plan - Lake & Shattuck Avenue South
C8.65-4 Channelization Plan - Logan Avenue South
C9.35-4 Temporary Water Demolition Plan
L0.30 Cover Sheet
L1.30 Overall Materials Plan
L1.31 Materials Plan
L1.32 Materials Plan
L1.33 Materials Plan
L1.34 Materials Plan
L1.35 Materials Plan
L1.36 Materials Plan
L1.37 Materials Plan
L1.37A Materials Plan - Add Alternate
L1.38 Materials Plan
L1.38A Materials Plan - Add Alternate
L1.39 Materials Plan
L1.40 Materials Plan
L1.41 Materials Plan
L1.42 Materials Plan
L1.43 Gates Exhibit
L1.44 Fencing Exhibit
L1.45 Sign Exhibit
L1.50 Overall Layout Plan
L1.51 Layout Plan
L1.52 Layout Plan
L1.55 Layout Plan
L1.56 Layout Plan
L1.57 Layout Plan
L1.58 Layout Plan
L1.59 Layout Plan
L1.60 Layout Plan
L1.62 Layout Plan
L1.63 Layout Point Table
L1.70 Overall Jointing & Surfacing Layout Plan
L1.71 Jointing & Surfacing Layout Plan
L1.72 Jointing & Surfacing Layout Plan
L1.73 Jointing & Surfacing Layout Plan
L1.74 Jointing & Surfacing Layout Plan
L1.75 Jointing & Surfacing Layout Plan
L1.76 Jointing & Surfacing Layout Plan
L1.77 Jointing & Surfacing Layout Plan
L1.78 Jointing & Surfacing Layout Plan
L1.79 Jointing & Surfacing Layout Plan
L1.80 Jointing & Surfacing Layout Plan
L1.81 Jointing & Surfacing Layout Plan
L1.82 Jointing & Surfacing Layout Plan
L1.83 Jointing & Surfacing Layout Point Table
L2.30 Overall Planting Plan
L2.31 Planting Plan
L2.32 Planting Plan
L2.35 Planting Plan
L2.36 Planting Plan
L2.37 Planting Plan
L2.37A Planting Plan - Add Alternate
L2.38 Planting Plan
L2.38A Planting Plan - Add Alternate
L2.39 Planting Plan
L2.40 Planting Plan
L2.41 Planting Plan
L2.42 Planting Plan
L2.43 Plant Schedule
L2.44 Plant Schedule
L3.30 Soil Placement Plan
L4.30 Overall Irrigation Plan
L4.31 Irrigation Plan
L4.32 Irrigation Plan
L4.34 Irrigation Plan
L4.35 Irrigation Plan
L4.36 Irrigation Plan
L4.41 Irrigation Plan
L4.42 Irrigation Plan
L4.43 Irrigation Schedule
L4.44 Valve Schedule
L5.33 Softball Layout Plan
L5.34 Softball Material Plan
L5.41 Throwing Layout Plan
L6.31 Site Details
L6.32 Materials Details
L6.33 Fencing Details
L6.34 Gate Details
L6.35 Athletic Field Surfacing & Drainage Details
L6.36 Backstop Details
L6.42 Track Event Details
L6.44 Track Details
L6.46 Netting Details
L6.49 Netting Details
E0.01-4 Electrical Legend, Notes, Light Fixture Schedule - Phase 2
E1.12-4 Electrical Site Lighting Plan - Interim Condition #2
E1.13-4 Electrical Site Lighting Plan - Interim Condition #3
E1.15-4 Electrical Site Lighting Plan - Interim Condition #5
E1.16-4 Electrical Site Lighting Plan - Coordination
E1.19b-4 Electrical Site Field Lighting Plan
E1.23-4 Electrical Site Power Plan - Interim Condition #3
E1.24-4 Electrical Site Power Plan - Interim Condition #4
E1.26-4 Electrical Site Power Plan - Interim Condition #6
E1.28-4 Electrical Site Power EV Plan
E1.33-4 Telecom Site Plan - Interim Condition #3
E1.41-4 Camera Site Plan - Interim Condition #1
E1.42-4 Camera Site Plan - Interim Condition #2
E1.43-4 Camera Site Plan - Interim Condition #3
E7.03-4 Telecom Site Infrastructure Details
E7.04-4 Camera Riser Diagram & Mounting Details
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.