This document has 485 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 000110 Table of Contents
Page 4 Section 001116 Invitation to Bidders
Page 7 Section 002113 Instructions to Bidders
Page 14 Section 002205 GC / CM Process
Page 28 Section 002217 Safety
Page 30 Section 002410 General Scope of Work
Page 38 Section 002413 Specific Scope of Work by Bid Package
Page 40 Bid Package Matrix
Page 41 Section 003100 Information Available to Bidders
Page 44 Appendix A Subsurface Exploration, Infiltration Feasibility, Geologic Hazard, and Preliminary Geotechnical Engineering Report
Page 150 Mahlum Release Agreement
Page 152 Section 003113 Schedule
Page 154 Section 004113 Bid Form
Page 157 Section 004115 Subcontractor Listing Form
Page 158 Section 004323 Schedule of Bid Alternates
Page 159 Section 005213 Form of the Contract
Page 160 AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor
Page 204 Subcontract Performance Bond
Page 207 Subcontractor Payment Bond
Page 209 Standard Subcontract
Page 227 Section 007200 General Conditions
Page 228 AIA Document A201-2017 General Conditions of the Contract for Construction
Page 303 Attachment 1 (Intentionally Omitted)
Page 304 Attachment 2 (Intentionally Omitted)
Page 305 Attachment 3 Construction Manager's Preconstruction Services Proposal
Page 306 Section 007343 Wage Rates Requirements
Page 308 Section 009900 Appendix A - Prevailing Wage Rates
Page 309 Section 011000 Summary
Page 314 Section 012000 Price and Payment Procedures
Page 318 Section 012300 Alternates
Page 320 Section 012500 Substitution Procedures
Page 325 Section 012500A Substitution Request Form
Page 327 Section 012600 Contract Modification Procedures
Page 332 Section 013100 Project Management and Coordination
Page 340 Section 013115 Communication
Page 346 Section 013119 Project Meetings
Page 353 Section 013216 Construction Progress Schedule
Page 364 Section 013300 Submittal Procedures
Page 375 Section 013300a Consent for the Release of Electronic Media
Page 377 Section 013553 Security Procedures
Page 378 Section 014000 Quality Requirements
Page 385 Section 015000 Temporary Facilities & Controls
Page 395 Section 015713 Temporary Erosion and Sediment Control
Page 401 Section 016000 Product Requirements
Page 405 Section 017000 Execution
Page 413 Section 017419 Construction Waste Management and Disposal
Page 418 Section 017700 Closeout Procedures
Page 427 Section 024100 Demolition
Page 431 Section 024113 Selective Site Demolition
Page 432 Section 311000 Site Preparation
Page 444 Section 312200 Earthwork
Page 457 Section 321216 Asphalt Paving
Page 462 Section 321313 Concrete Paving
Page 467 Section 334000 Storm Drainage
Page 471 Section 340000 Transportation