South Whidbey School District Facilities Mods & Upgrades Bundle, Langley, WA - High School - Middle School Plans
Cover Sheet
G001 Index, Vicinity Map, Legal Description
G010 Site Plan
G020 Code Analysis, Life Safety Plans
G021 Life Safety Plan
G040 Phasing Plan
AD101 Demolition Plan - Level 1 - Overall
AD101-B Demolition Plan - Level 1 - Area B
AD101-C Demolition Plan - Level 1 - Area C
AD101-D Demolition Plan - Level 1 - Area D
AD101-E Demolition Plan - Level 1 - Area E
AD101-F Demolition Plan - Level 1 - Area F
AD102 Demolition Plan - Level 2 - Overall
AD102-B Demolition Plan - Level 2 - Area B
AD102-C Demolition Plan - Level 2 - Area C
AD102-D Demolition Plan - Level 2 - Area D
AD121 Demolition Reflected Ceiling Plan - Level 1 - Overall
AD122 Demolition Reflected Ceiling Plan - Level 2 - Overall
OS-001 Cover Sheet
OS-100 Overall Site Plan
OS-101 North Entry Site Plan
OS-102 Grand Stands Plan
OS-103 Drainfield Area Site Plan
OS-200 Details
OS-201 Details
OS-300 Specifications
OS-301 Specifications
OS-302 Specifications
C1.0 Cover Sheet
C1.1 Overall Plan
C2.1 TESC and Demolition Plan
C2.2 TESC and Demolition Plan
C2.3 TESC and Demolition Plan
C2.4 TESC and Demolition Plan
C2.5 TESC and Demolition Plan
C2.6 TESC and Demolition Plan
C2.7 TESC Notes and Details
C2.8 TESC and Demolition Plan - Alternates
C3.1 Grading, Storm Drainage and Utility Plan
C3.2 Grading, Storm Drainage and Utility Plan
C3.3 Grading, Storm Drainage and Utility Plan
C3.4 Grading, Storm Drainage and Utility Plan
C3.5 Grading, Storm Drainage and Utility Plan
C3.6 Grading, Storm Drainage and Utility Plan
C3.7 Grading, Storm Drainage and Utility Plan - Alternates
C4.1 Surfacing and Horizontal Control Plan
C4.2 Surfacing and Horizontal Control Plan
C4.3 Surfacing and Horizontal Control Plan
C4.4 Surfacing and Horizontal Control Plan
C4.5 Surfacing and Horizontal Control Plan
C4.6 Surfacing and Horizontal Control Plan
C4.7 Surfacing and Horizontal Control Plan - Alternates
C5.1 Notes and Details
C5.2 Notes and Details
C5.3 Notes and Details
L100 Overall Site Plan
L101 Site Plan (North)
L102 Site Plan (South)
L103.1 Site Plan (Entry Plazas)
L103.2 Site Plan (Courtyards)
L104 Site Plan Bid (Alternates)
L105 Overall Site Layout
L106 Site Layout (North)
L107 Site Layout (South)
L108.1 Site Layout Enlargements
L108.2 Site Layout Enlargements
L200 Overall Landscape Plan
L201 Landscape Plan (North)
L202 Landscape Plan (South)
L203 Plant Schedule & Details
L204 Soil Plan
L300 Overall Irrigation Plan
L301 Irrigation Plan (North)
L302 Irrigation Plan (South)
L400 Landscape Details
L401 Landscape Details
L402 Landscape Details
L403 Landscape Details
L404 Landscape Details
L405 Landscape Details
L406 Landscape Details
L407 Landscape Details
L500 Overall Subdrainage Plan
L501 Subdrainage Plan (North)
L502 Subdrainage Plan (South)
S001 Structural General Notes
S002 Structural General Notes
S020 Typical Footing Details
S021 Typical Slab-On-Grade Details
S022 Typical Concrete Details
S023 Typical Concrete Masonry and Veneer Details
S024 Typical Metal Deck and Joist Details
S025 Typical Steel Details
S026 Typical Steel Details
S027 Typical Metal Stud Details
S028 Typical Wood Details
S029 Typical Wood Details
S101 Overall Foundation Plan
S101A Foundation Plan - Area A
S101B Foundation Plan - Area B
S101C Foundation Plan - Area C
S101D Foundation Plan - Area D
S101E Foundation Plan - Area E
S101F Foundation Plan - Area F
S102 Overall Level 2 Framing Plan
S102A Level 2 Framing Plan - Area A
S102B Level 2 Framing Plan - Area B
S102C Level 2 Framing Plan - Area C
S102D Level 2 Framing Plan - Area D
S102E Level 2 Framing Plan - Area E
S102F Level 2 Framing Plan - Area F
S103 Overall Roof Framing Plan
S103A Roof Framing Plan - Area A
S103B Roof Framing Plan - Area B
S103C Roof Framing Plan - Area C
S103D Roof Framing Plan - Area D
S103E Roof Framing Plan - Area E
S103F Roof Framing Plan - Area F
S201 Structural Wall Elevations
S202 Structural Wall Elevations
S203 Structural Wall Elevations
S204 Ticket - Restrooms Building Wall Elevations
S205 Structural Wall Elevations
S206 Structural Wall Elevations
S300 Foundation Details & Sections
S301 Foundation Details & Sections
S310 Framing Details & Sections
S311 Framing Details & Sections
S312 Framing Details & Sections
S313 Framing Details & Sections
S320 Stair Details
S321 Stair Details
S401 Stair
S402 PAC Canopy
S403 Admin Canopy
S404 Ticket - Restrooms Building
S405 Office Addition
S501 Load Diagrams
S601 Building Sections
A001 General Architectural Notes
A010 Interior Assemblies
A012 Exterior Assemblies
A101 Level 1 Floor Plan - Overall
A101-A Level 1 Floor Plan - Area A
A101-B Level 1 Floor Plan - Area B
A101-C Level 1 Floor Plan - Area C
A101-D Level 1 Floor Plan - Area D
A101-E Level 1 Floor Plan - Area E
A101-F Level 1 Floor Plan - Area F
A102 Level 2 Floor Plan - Overall
A102-B Level 2 Floor Plan - Area B
A102-C Level 2 Floor Plan - Area C
A102-D Level 2 Floor Plan - Area D
A106 Roof Plan - Canopies
A121 Level 1 - Reflected Ceiling Plan - Overall
A121-A Level 1 - Reflected Ceiling Plan - Area A
A121-B Level 1 - Reflected Ceiling Plan - Area B
A121-C Level 1 - Reflected Ceiling Plan - Area C
A121-D Level 1 - Reflected Ceiling Plan - Area D
A121-E Level 1 - Reflected Ceiling Plan - Area E
A121-F Level 1 - Reflected Ceiling Plan - Area F
A122 Level 2 - Reflected Ceiling Plan - Overall
A122-B Level 2 - Reflected Ceiling Plan - Area B
A122-C Level 2 - Reflected Ceiling Plan - Area C
A122-D Level 2 - Reflected Ceiling Plan - Area D
A131 Press Box - Plans, Elevations
A132 Press Box - Wall Sections, Interior Elevations
A133 Ticket Restroom Building - Alternate 1
A151 Mat Room - Hoist Alternate #3
A215 Exterior Elevations - Signage
A303 Sections - Canopies
A317 Wall Sections - Ticket Restrooms Building - Alternate 1
A356 Details - Ticket Restrooms Building - Alternate 1
A358 Details - Press Box
A371 Details - Canopy
A372 Details - Canopy
A400 Equipment and Finish Schedule
A401-A Level 1 - Finish Plan - Area A
A401-B Level 1 - Finish Plan - Area B
A401-C Level 1 - Finish Plan - Area C
A401-D Level 1 - Finish Plan - Area D
A401-E Level 1 - Finish Plan - Area E
A401-F Level 1 - Finish Plan - Area F
A402-B Level 2 - Finish Plan - Area B
A402-C Level 2 - Finish Plan - Area C
A402-D Level 2 - Finish Plan - Area D
A410 Enlarged Plans, Interior Elevations - Administration TI
A411 Enlarged Plans, Interior Elevations - Office Addition
A412 Enlarged Plans, Interior Elevations - Restrooms
A413 Enlarged Plans, Interior Elevations - Restrooms
A414 Enlarged Plans, Interior Elevations - Restrooms
A415 Enlarged Plans, Interior Elevations - Restrooms
A416 Enlarged Plans, Interior Elevations - Restrooms
A417 Enlarged Plans, Interior Elevations - Main Gym Locker Room
A418 Enlarged Plans, Interior Elevations - Main Gym Locker Room
A419 Enlarged Plans, Interior Elevations - Aux Gym Locker Rooms
A420 Enlarged Plans, Interior Elevations - HS Falcon's Nest
A421 Enlarged Plan, Interior Elevations - Ticket Restroom Building Alternate #1
A422 Interior Elevations
A471 Details - Interior Floor / Wall
A472 Details - Interior Floor / Wall
A473 Details - Interior Floor / Wall
A481 Details - Ceiling
A491 Details - Casework
A492 Details - Casework
A501 Enlarged Stair Plans & Sections
A511 Details - Stair
A512 Details - Stair
A513 Details - Stair
A602 Opening Types, Door Schedule
A613 Details - Openings
A614 Details - Openings
A701 Signage Schedule
A711 Signage Types
M001 Mechanical Legend
M002 Mechanical General Notes
M003 Mechanical Schedules
M004 Mechanical Schedules
M005 Mechanical Schedules
M006 Mechanical Schedules
M007 Mechanical Schedules
M008 Mechanical Schedules
M009 Mechanical Schedules
M010 Mechanical Schedules
M011 Mechanical Schedules
M012 Mechanical Schedules
M013 Mechanical Alternate #1 Schedules
M014 Mechanical Energy Code Compliance Schedules
M015 Mechanical Energy Code Compliance Schedules
M016 Mechanical Energy Code Compliance Schedules
MS100 Mechanical Site Plan
MD201 Plumbing Demolition Plan - Level 1
MD202 Plumbing Demolition Plan - Level 2
MD301 HVAC Demolition Plan - Level 1
MD302 HVAC Demolition Plan - Level 2
MD601 Roof Demolition Plan - Overall
MD701 Enlarged Demolition Plan
M101A Plumbing Plan - Underground - Area A
M101B Plumbing Plan - Underground - Area B
M101C Plumbing Plan - Underground - Area C
M101D Plumbing Plan - Underground - Area D
M101E Plumbing Plan - Underground - Area E
M101F Plumbing Plan - Underground - Area F
M201A Plumbing Plan - Level 1 - Area A
M201B Plumbing Plan - Level 1 - Area B
M201C Plumbing Plan - Level 1 - Area C
M201D Plumbing Plan - Level 1 - Area D
M201E Plumbing Plan - Level 1 - Area E
M201F Plumbing Plan - Level 1 - Area F
M202B Plumbing Plan - Level 2 - Area B
M202C Plumbing Plan - Level 2 - Area C
M202D Plumbing Plan - Level 2 - Area D
M301A HVAC Plan - Level 1 - Area A
M301B HVAC Plan - Level 1 - Area B
M301C HVAC Plan - Level 1 - Area C
M301D HVAC Plan - Level 1 - Area D
M301E HVAC Plan - Level 1 - Area E
M301F HVAC Plan - Level 1 - Area F
M302B HVAC Plan - Level 2 - Area B
M302C HVAC Plan - Level 2 - Area C
M302D HVAC Plan - Level 2 - Area D
M401 VRF Piping Diagrams
M402 VRF Piping Diagrams
M403 VRF Piping Diagrams
M501 Fire Protection Plan - Level 1
M502 Fire Protection Plan - Level 2
M601A Roof Plan - Area A
M601B Roof Plan - Area B
M601C Roof Plan - Area C
M601D Roof Plan - Area D
M601E Roof Plan - Area E
M601F Roof Plan - Area F
M701 Alternate #1 Outbuilding Enlarged Plans
M702 Mechanical Enlarged Plans
M901 Mechanical Details
M902 Mechanical Details
M903 Mechanical Details
M904 Mechanical Details
M905 Mechanical Details
M906 Mechanical Details and Alternate #1 Details
M1001 Mechanical Controls
M1002 Mechanical Controls
M1003 Mechanical Controls
M1004 Mechanical Controls
M1005 Mechanical Controls
M1006 Mechanical Controls
M1007 Mechanical Controls
M1008 Mechanical Controls
M1009 Mechanical Controls
E001 Electrical Legend and Drawing Index
E002 Electrical Abbreviations and General Notes
E003 Telecommunications and Security Rough-In Schedules
E004 Existing Light Fixture Schedule
E005 New Light Fixture Schedule
E006 Mechanical Equipment Schedules
E007 Mechanical Equipment Schedules
E100 Electrical Site Plan
ED201A Lighting Demolition Floor Plan - Area A
ED201B Lighting Demolition Floor Plan - Area B
ED201C Lighting Demolition Floor Plan - Area C
ED201D Lighting Demolition Floor Plan - Area D
ED201E Lighting Demolition Floor Plan - Area E
ED201F Lighting Demolition Floor Plan - Area F
ED202B Lighting Demolition Floor Plan - Level 2 - Area B
ED202C Lighting Demolition Floor Plan - Level 2 - Area C
ED202D Lighting Demolition Floor Plan - Level 2 - Area D
ED301A Power Demolition Floor Plan - Area A
ED301B Power Demolition Floor Plan - Area B
ED301C Power Demolition Floor Plan - Area C
ED301D Power Demolition Floor Plan - Area D
ED301E Power Demolition Floor Plan - Area E
ED301F Power Demolition Floor Plan - Area F
ED302B Power Demolition Floor Plan - Level 2 - Area B
ED302C Power Demolition Floor Plan - Level 2 - Area C
ED302D Power Demolition Floor Plan - Level 2 - Area D
ED303 Power Demolition Floor Plan - Roof - Overall
ED601 Telecommunications and Security Demolition Floor Plan - Level 1 - Overall
ED601B Telecommunications and Security Demolition Floor Plan - Area B
ED601C Telecommunications and Security Demolition Floor Plan - Area C
ED601D Telecommunications and Security Demolition Floor Plan - Area D
ED601E Telecommunications and Security Demolition Floor Plan - Area E
ED601F Telecommunications and Security Floor Plan - Area F
ED602 Telecommunications and Security Demolition Floor Plan - Level 2 - Overall
ED602B Telecommunications and Security Demolition Floor Plan - Level 2 - Area B
ED602C Telecommunications and Security Demolition Floor Plan - Level 2 - Area C
ED602D Telecommunications and Security Demolition Floor Plan - Level 2 - Area D
E201 Lighting Floor Plan - Level 1 - Overall
E201A Lighting Floor Plan - Level 1 - Area A
E201Aa Lighting Control Zone Plan - Area A
E201B Lighting Floor Plan - Level 1 - Area B
E201Ba Lighting Control Zone Plan - Area B
E201C Lighting Floor Plan - Level 1 - Area C
E201Ca Lighting Control Zone Plan - Area C
E201D Lighting Floor Plan - Level 1 - Area D
E201Da Lighting Control Zone Plan - Area D
E201E Lighting Floor Plan - Level 1 - Area E
E201Ea Lighting Control Zone Plan - Area E
E201F Lighting Floor Plan - Level 1 - Area F
E201Fa Lighting Control Zone Plan - Area F
E202B Lighting Floor Plan - Level 2 - Area B
E202Ba Lighting Control Zone Plan - Second Floor - Area B
E202C Lighting Floor Plan - Level 2 - Area C
E202Ca Lighting Control Zone Plan - Second Floor - Area C
E202D Lighting Floor Plan - Level 2 - Area D
E202Da Lighting Control Zone Plan - Second Floor - Area D
E301A Power Floor Plan - Level 1 - Area A
E301B Power Floor Plan - Level 1 - Area B
E301C Power Floor Plan - Level 1 - Area C
E301D Power Floor Plan - Level 1 - Area D
E301E Power Floor Plan - Level 1 - Area E
E301F Power Floor Plan - Level 1 - Area F
E302B Power Floor Plan - Level 2 - Area B
E302C Power Floor Plan - Level 2 - Area C
E302D Power Floor Plan - Level 2 - Area D
E303 Power Floor Plan - Roof - Overall
E304C Solar Roof Plan - Area C
E304F Solar Roof Plan - Area F
E601 Telecommunications and Security Floor Plan - Level 1 - Overall
E601B Telecommunications and Security Floor Plan - Area B
E601C Telecommunications and Security Floor Plan - Area C
E601D Telecommunications and Security Floor Plan - Area D
E601E Telecommunications and Security Floor Plan - Area E
E601F Telecommunications and Security Floor Plan - Area F
E602 Telecommunications and Security Floor Plan - Level 2 - Overall
E602B Telecommunications and Security Floor Plan - Second Floor - Area B
E602C Telecommunications and Security Floor Plan - Second Floor - Area C
E602D Telecommunications and Security Floor Plan - Second Floor - Area D
E603 Telecommunications and Security Floor Plan - Roof - Overall
E701 Enlarged Floor Plans - Ticket Booth
E702 Enlarged Electrical Floor Plans - Courtyard
E703 Enlarged Floor Plans - Press Box
E704 Electrical Details
E705 Electrical Details
E801 Enlarged MDF Room
E802 Telecommunications and Security Details
E803 Telecommunications and Security Details
E804 Telecommunications and Security Details
E901 Electrical One-Line Diagram
E902 Electrical One-Line Diagram
E903 PV One-Line Diagram
E1001A Electrical Panel Schedules - Before
E1002A Electrical Panel Schedules - Before
E1003A Electrical Panel Schedules - Before
E1004A Electrical Panel Schedules - Before
E1005A Electrical Panel Schedules - Before
E1006A Electrical Panel Schedules - Before
E1007A Electrical Panel Schedules - Before
E1011A Electrical Panel Schedules - Before
E1012A Electrical Panel Schedules - Before
E1013A Electrical Panel Schedules - Before
E1014A Electrical Panel Schedules - Before
E1021A Electrical Panel Schedules - Before
E1022A Electrical Panel Schedules - Before
E1031A Electrical Panel Schedules - Before
E1032A Electrical Panel Schedules - Before
E1001B Electrical Panel Schedules - After
E1002B Electrical Panel Schedules - After
E1003B Electrical Panel Schedules - After
E1004B Electrical Panel Schedules - After
E1005B Electrical Panel Schedules - After
E1006B Electrical Panel Schedules - After
E1007B Electrical Panel Schedules - After
E1011B Electrical Panel Schedules - After
E1012B Electrical Panel Schedules - After
E1013B Electrical Panel Schedules - After
E1014B Electrical Panel Schedules - After
E1021B Electrical Panel Schedules - After
E1022B Electrical Panel Schedules - After
E1023B Electrical Panel Schedules - After
E1031B Electrical Panel Schedules - After
E1032B Electrical Panel Schedules - After
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.