Aspen Court Hotel Conversion, Tacoma, WA
Plans
Site Development & ROW Improvement Plans
Outline Specs
Addendum #1
Addendum #1 Plans
Addendum #1 Outline Specs
Register as a Bidding Subcontractor and be notified of new docs on this project.
Builders Exchange of Washington, Inc. Subs and Suppliers
Bids to:
Buchanan General Contracting Company
2200 112th Ave NE, Suite 160
Bellevue, WA 98004
425-462-1326
Fax: 425-462-9468
Questions: Terry Buchanan
Terry@buchanangc.com
Email bids to: Diana Jorgensen
Diana@buchanangc.com
Description:
Rehabilitation and hotel conversion of an existing R-1 hotel to R-2 multifamily apartments for Permanent Supportive Housing. Convert (90) existing hotel rooms, or “sleeping units,” into IBC code compliant “efficiency dwelling units,” (EDU’s.) Of primary importance will be to add new, small kitchens (kitchenettes) to the units with a kitchen sink, cooktop appliance, range hood, and refrigerator, and each unit having the minimum dimensional space requirements, and light and ventilation conforming to building code. Units will also receive new, individual unit electrical panels with new circuits to the units as well as plumbing upgrades to install the new kitchen sinks. New offices will also be created for LIHI staff in the former pool room area. New common laundry rooms also to be provided. Site work to include a new, fenced synthetic turf dog run area, new sewer catch basin, trash enclosure, and new sewer trench and piping from the trash area location to city sewer system in the street ROW, and accessible sidewalk, driveway, and ROW improvements.
• Mechanical and Electrical subcontractors have already been selected.
• Washington State Residential Prevailing Wages apply.
Please note on your bid:
1. Prevailing Wage included,
2. Any Alternates,
3. If you have apprentices, are WMBE, or Section 3.
Notes:
• BGC has been awarded this project through a RFQ process
• Washington State Residential Prevailing Wages Apply
• Expected Start: May 5, 2025
• Expected Finish: January 27, 2026