Everett Community College - Existing Baker Hall Demolition and Restoration - Bid Set 1, Everett, WA - Addendum #1 Existing Plans - 1985 Alterations
T-1 General Notes, Abbreviations, Legend
A-1 Site Plan, Roof Plan
A-2 Demolition Plan, Demolition Notes
A-3 1/8" Floor Plan
A-4 1/4" Partial First Floor Plan (West)
A-5 1/4" Partial First Floor Plan (East)
A-7 1/4" Partial Second Floor Plan (East)
A-8 Elevations
A-9 Elevations, Sections, Miscellaneous Details
A-10 Interior Elevations, Miscellaneous Details
A-11 Door Schedule, Miscellaneous Details
A-12 Room Finish Schedule, Schedules, Miscellaneous Details
A-13 Structural Details
A-14 Miscellaneous Details
A-15 Reflected Ceiling Plan
M-1 Site Plan, Notes Schedules
M-2 Mechanical Demolition Plan
M-3 Foundation Plan, Miscellaneous Details
M-4 Floor Plan
M-5 Partial Floor Plan
E-1 Legend, General Notes, Schedules, Riser Diagrams
E-2 Lighting Plans
E-3 Power & Communication Plans
E-4 Fire Alarm System, Main Distribution Panel Schedule
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.