Repair and Convert Security Forces Assistance Brigade Buildings 3279, 3280, & 3281, Joint Base Lewis-McChord, WA #W912DW20B0009 - Building 3280 Plans
G-001 Cover Sheet
G-002 Sheet Index
G-003 ATFP Site Plan
G-101 Life Safety Code Sheet 1
G-102 Life Safety Code Sheet 2
G-103 Life Safety Code Sheet 3
G-104 Life Safety Site Plan
G-105 Life Safety Basement Plan
G-106 Life Safety First Floor Plan - Area 1
G-107 Life Safety First Floor Plan - Area 2
G-108 Life Safety Second Floor Plan
G-109 Life Safety Third Floor Plan
HD001 Hazardous Materials Notes
HD100 Crawl Space Plan
HD101 Basement Plan
HD102 First Floor Plan
HD103 Second Floor Plan
HD104 Third Floor Plan
C-001 Civil General Notes
C-002 Civil Legend and Abbreviations
C-003 Horizontal Control
C-004 Haul Route
V-100 Existing Conditions Site Plan
CD100 Demolition and TESC Plan
CD500 Demolition and TESC Details
CU100 Utility Site Plan
CU200 Utility Plan and Profile
CU201 Utility Plan and Profile
CU202 Utility Plan and Profile
CU203 Utility Plan and Profile
CU204 Utility Plan and Profile
CU500 Utility Details
CU501 Utility Details
PV100 Paving Plan
PV400 Equipment Pad Enlargement Plan
S-001 Structural General Notes - Sheet 1
S-002 Structural General Notes - Sheet 2
S-003 Abbreviations and Legend
S-004 Wind Load Diagrams
SD101 Demolition Basement Foundation Plan - Area 1
SD102 Demolition Basement Foundation Plan - Area 2
SD103 Demolition First Floor Plan - Area 1
SD104 Demolition First Floor Plan - Area 2
SD105 Demolition Second Floor Plan
SD106 Demolition Third Floor Plan
S-101 Basement Foundation Plan - Area 1
S-102 Basement Foundation Plan - Area 2
S-103 First Floor Plan - Area 1
S-104 First Floor Plan - Area 2
S-105 Second Floor Plan
S-106 Third Floor Plan
S-201 Elevations
S-202 Elevations
S-203 Elevations
S-204 Elevations
S-205 Elevations
S-206 Elevations
S-301 Sections - Area 1
S-302 Sections - Area 2
S-303 Vault Sections
S-401 Enlarged Basement Foundation Plan
S-411 Enlarged First Floor Plan
S-501 Typical Details
S-502 Typical Details
S-503 Typical Details
S-504 Vault Details
S-505 Vault Details
S-506 Steel Strap Details
S-507 Steel Strap Details
S-510 Shear Wall Details
S-515 CMU Shear Wall Details
S-520 Window Details
S-5221 Window Details
A-001 General Notes, Abbreviations
AD101 Basement Floor Demolition Plan
AD102 First Floor Demolition Plan - Area 1
AD103 First Floor Demolition Plan - Area 2
AD104 Second and Third Floor Demolition Plan
AD111 Basement Floor Demolition Ceiling Plan
AD112 First Floor Demolition Ceiling Plan - Area 1
AD113 First Floor Demolition Ceiling Plan - Area 2
AD114 Second and Third Floor Demolition Ceiling Plan
AD501 Demolition Photos
A-101 Basement Floor Plan
A-102 First Floor Plan - Area 1
A-103 First Floor Plan - Area 2
A-104 Second Floor Plan
A-105 Third Floor Plan
A-111 Basement Reflected Ceiling Plan
A-112 First Floor Reflected Ceiling Plan - Area 1
A-113 First Floor Reflected Ceiling Plan - Area 2
A-114 Second Floor Reflected Ceiling Plan
A-115 Third Floor Reflected Ceiling Plan
A-201 Exterior Elevations
A-202 Exterior Elevations
A-203 Exterior Elevations
A-301 Building Sections
A-302 Building Sections
A-303 Wall Sections
A-304 Wall Sections
A-401 Enlarged Restroom Plans
A-402 Enlarged Plans
A-501 Door Details
A-502 Soffit and Ceiling Framing Details
A-503 Wall Framing Details
A-504 Wall Framing Details
A-505 Wall Framing Details
A-507 Window Details
A-511 Details - Interior
A-512 Details - Interior Signage
A-513 Details - Interior and Exterior Signage
A-514 Details - Interior Casework
A-601 Door and Frame Types
A-602 Door Schedule
A-603 Door Schedule
A-604 Wall Types
A-605 Window Types
A-606 Window Types
A-607 Floor and Ceiling Types
A-608 Seismic Ceiling Details
A-609 Seismic Ceiling Details
A-801 Air Barrier Diagrams
A-802 Air Barrier Diagrams
I-101 Basement FF&E Plan
I-102 First Floor FF&E Plan - Area 1
I-103 First Floor FF&E Plan - Area 2
I-104 Second Floor FF&E Plan
I-105 Third Floor FF&E Plan
I-106 Basement Finish Plan
I-107 First Floor Finish Plan - Area 1
I-108 First Floor Finish Plan - Area 2
I-109 Second Floor Finish Plan
I-110 Third Floor Finish Plan
I-601 Finish Legend
I-602 Finish Schedule - Basement, First and Second Floor
I-603 Finish Schedule - Third Floor
I-604 FF&E Legend
I-605 Signage Schedule - Basement, First, Second and Third Floor
FA001 Fire Alarm / Mass Notification System Legend and Notes
FA002 Fire Alarm / Mass Notification System Requirements and Construction Notes
FA003 Fire Alarm / Mass Notification System General Notes, Zone Schedule and Antenna Detail
FA004 Fire Alarm / Mass Notification System Sequence of Operations Matrix
FA005 Fire Alarm / Mass Notification Monaco Transmitter Detail
FA201 Fire Alarm / Mass Notification System Basement Plan
FA202 Fire Alarm / Mass Notification System First Floor Plan - Area 1
FA203 Fire Alarm / Mass Notification System First Floor Plan - Area 2
FA204 Fire Alarm / Mass Notification System Second Floor Plan
FA205 Fire Alarm / Mass Notification System Third Floor Plan
FX001 Fire Protection Legend, Design Criteria and Flow Test
FX002 Fire Protection Construction, General and Special Notes
FX003 Fire Protection Riser Detail Notes and Equipment List
FX004 Fire Protection System Riser Details
FX201 Fire Protection Basement Floor Plan
FX202 Fire Protection First Floor Plan - Area 1
FX203 Fire Protection First Floor Plan - Area 2
FX204 Fire Protection Second Floor Plan
FX205 Fire Protection Third Floor Plan
M-001 Mechanical Legend
MD110 Mechanical Demolition Plan - Basement and Crawlspace - Area 1
MD111 Mechanical Demolition Plan - Basement and Crawlspace - Area 2
MD112 Mechanical Demolition Plan - First Floor - Area 1
MD113 Mechanical Demolition Plan - First Floor - Area 2
MD114 Mechanical Demolition Plan - Second Floor
MD115 Mechanical Demolition Plan - Third Floor
M-110 Mechanical Reflected Ceiling Plan - Basement - Area 2
M-111 Mechanical Reflected Ceiling Plan - First Floor - Area 1
M-112 Mechanical Reflected Ceiling Plan - First Floor - Area 2
M-113 Mechanical Reflected Ceiling Plan - Second Floor
M-114 Mechanical Reflected Ceiling Plan - Third Floor
M-120 Mechanical Plan - Basement and Crawlspace - Area 1
M-121 Mechanical Plan - Basement and Crawlspace - Area 2
M-122 Mechanical Plan - First Floor - Area 1
M-123 Mechanical Plan - First Floor - Area 2
M-124 Mechanical Plan - Second Floor
M-125 Mechanical Plan - Third Floor
M-130 Piping Plan - Basement and Crawlspace - Area 1
M-131 Piping Plan - Basement and Crawlspace - Area 2
M-132 Piping Plan - First Floor - Area 1
M-133 Piping Plan - First Floor - Area 2
M-134 Piping Plan - Second Floor
M-135 Piping Plan - Third Floor
M-401 Enlarged Piping Plan
M-501 Mechanical Details I
M-502 Mechanical Details II
M-601 Mechanical Schedules I
M-602 Mechanical Schedules II
M-603 Mechanical Schedules III
M-611 Hydronic Diagram
M-612 Hydronic Riser Diagram
M-701 Mechanical Controls I
M-702 Mechanical Controls II
E-001 Electrical Legend
E-002 Electrical Notes
ES101 Electrical Site Plan
ED111 Basement Electrical Demolition Plan
ED112 First Floor Electrical Demolition Plan - Area - 1
ED113 First Floor Electrical Demolition Plan - Area 2
ED114 Second and Third Floor Electrical Demolition Plan - Area 2
E-120 Basement Lighting Plan
E-121 First Floor Lighting Plan - Area 1
E-122 First Floor Lighting Plan - Area 2
E-123 Second Floor Lighting Plan - Area 2
E-124 Third Floor Lighting Plan - Area 2
E-125 Basement Lighting Egress Plan
E-126 First Floor Lighting Egress Plan - Area 1
E-127 First Floor Lighting Egress Plan - Area 2
E-128 Second Floor Lighting Egress Plan - Area 2
E-129 Third Floor Lighting Egress Plan - Area 2
E-130 Basement Power Plan
E-131 First Floor Power Plan - Area 1
E-132 First Floor Power Plan - Area 2
E-133 Second Floor Power Plan - Area 2
E-134 Third Floor Power Plan - Area 2
E-501 Lighting Control Wiring Diagrams
E-502 Electrical Details
E-601 Electrical One-Line Diagram
E-602 Panel Schedules - Sheet 1
E-603 Panel Schedules - Sheet 2
E-604 Panel Schedules - Sheet 3
E-605 Panel Schedules - Sheet 4
E-610 Mechanical Schedules
E-611 Fixture Schedule
E-612 Fixture Schedule
T1-001 Telecommunications Legend, Abbreviations and Notes
T1-100 Overall Basement Telecommunications Plan
T1-101 Overall First Floor Telecommunications Plan
T1-102 Overall Second Floor Telecommunications Plan
T1-103 Overall Third Floor Telecommunications Plan
T2-110 Telecommunications Basement Plan
T2-111 Telecommunications First Floor Plan - Area 1
T2-112 Telecommunications First Floor Plan - Area 2
T2-113 Telecommunications Second Floor Plan
T2-114 Telecommunications Third Floor Plan
T3-401 Telecommunications Enlarged Plan Telecom 106
T3-402 Telecommunications Enlarged Plan Telecom 213
T3-403 Telecommunications Enlarged Plan Telecom 313
T4-501 Telecommunications Outlet Details
T4-502 Telecommunications Grounding Details
T4-601 Telecommunications Riser Diagrams
EY001 Systems Legend, Abbreviations and Notes
EY100 Overall Basement Systems Plan
EY111 Systems First Floor Plan - Area 1
EY112 Systems First Floor Plan - Area 2
EY113 Systems Second Floor Plan
EY114 Systems Third Floor Plan
EY501 Systems Audio Visual Details
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.