Key Peninsula Middle School Modernization & Addition, Peninsula School District, Lakebay, WA - Specs Volume 4    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 728 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 13 Project Directory
Page 15 Section 000110 Table of Contents
Page 25 Section 260500 General Electrical Provisions
Page 43 Section 260510 Basic Electrical Materials and Methods
Page 49 Section 260511 Electrical Connections for Equipment
Page 53 Section 260512 Electrical Demolition
Page 57 Section 260519 Wire and Cables
Page 65 Section 260526 Grounding and Bonding
Page 71 Section 260529 Supporting Devices
Page 77 Section 260533 Raceway Systems
Page 85 Section 260534 Outlet Boxes
Page 89 Section 260535 Floor Outlet Devices
Page 93 Section 260543 Underground Vaults and Raceways
Page 103 Section 260548 Vibration Isolation and Seismic Control for Electrical Systems
Page 111 Section 260553 Electrical Identification
Page 119 Section 260573 Electrical Power Studies
Page 125 Section 260800 Commissioning of Electrical Systems
Page 143 Section 260810 Electrical Testing
Page 149 Section 260913 Power Monitoring System
Page 155 Section 260923 Lighting and Receptacle Controls
Page 175 Section 262200 Transformers
Page 181 Section 262410 Service Entrance
Page 185 Section 262413 Switchboards
Page 191 Section 262416 Panelboards
Page 195 Section 262726 Wiring Devices
Page 201 Section 262813 Overcurrent Protective Devices
Page 207 Section 262816 Disconnect Switches and Enclosed Circuit Breakers
Page 211 Section 262913 Motor Controllers
Page 217 Section 263213 Packaged Engine Generator
Page 231 Section 263600 Transfer Switches
Page 241 Section 264313 Surge Protective Devices
Page 251 Section 265100 Lighting
Page 263 Section 265561 Stage Lighting System
Page 271 Section 270000 Communications Work Specified in Division 26
Page 273 Section 271100 Telecommunications System
Page 313 Section 274100 Classroom Audio Visual System
Page 323 Section 274113 Performance Audio Visual System - Commons
Page 347 Section 274114 Performance Audio Visual System - Gym
Page 371 Section 274116 Performance Sound Systems
Page 383 Section 275123 IP Intercom and Clock System
Page 397 Section 280800 Commissioning of Electronic Safety & Security
Page 415 Section 281300 Access Control System
Page 431 Section 281600 Intrusion Detection System
Page 447 Section 282300 IP Security Video System
Page 457 Section 283111 Fire Alarm and Detection System
Page 475 Section 311000 Site Clearing and Site Demolition
Page 485 Section 312000 Earth Moving
Page 505 Section 312316.13 Trenching
Page 508 Section 312513 Erosion Control
Page 518 Example CSWPPP
Page 570 Section 331635 Concrete Water Reservoir
Page 578 Section 321216 Asphalt Paving
Page 586 Section 321313 Concrete Paving
Page 600 Section 328400 Irrigation
Page 612 Section 328411 Irrigation Booster Pump
Page 620 Section 329113 Soil Preparation
Page 626 Section 329200 Turf and Grasses
Page 636 Section 329300 Plants
Page 646 Section 331116 Water Distribution
Page 658 Peninsula Light Company Standard Construction Specifications
Page 670 Section 331635 Concrete Water Reservoir
Page 678 Section 333111 Sanitary Sewerage
Page 686 Section 333113 Site Sanitary Sewerage Gravity Piping
Page 689 Section 333123 Sanitary Sewerage Force Main Piping
Page 693 Section 333211 Wastewater Pumping Stations
Page 695 Section 333413 Septic Tanks
Page 698 Section 334100 Storm Utility Drainage Piping
Page 708 Section 334600 Subdrainage
Page 714 Section 413423.33 Spray Painting Booths
Page 722 Section 460006 Wastewater Treatment System
Page 725 Section 460923 Monitoring and Control Instrumentation