AC Davis High School - Auditorium Upgrades, Yakima School District, Yakima, WA - Plans
A0.00 Cover Sheet
R1.00 Code Review
C1.01 General Notes, Legend & Abbreviations
C1.02 Demo & TESC Plan
C2.01 Site Plan
C3.01 Grading & Storm Plan
C4.01 Composite Utility Plan
C5.01 Details
C6.01 WSDOT Standard Plans
D2.00 Demolition Plan - Level 0
D2.01 Demolition Plan - Level 1
D2.02 Demolition Plan - Level 2
D2.03 Demolition Plan - Level 3
D3.00 Demolition Plan - RCP - Level 0, Level 1
D3.01 Demolition Plan - RCP - Level 2
A1.00 Site Plan
A2.00 Level 0 - Basement
A2.01 Level 1 - Auditorium
A2.02 Level 2 - Upper Lobby
A2.03 Level 3 - Balcony
A2.04 Level 4 - Catwalks
A2.05 Enlarged Plans
A3.01 Level 0, Level 1 - Ceiling Plan
A3.02 Level 2 - Upper Lobby RCP
A3.03 Level 3 - Ceiling Plan
A4.00 Roof Plan
A5.00 Exterior Elevations
A6.00 Building Sections
A6.01 Building Sections
A7.00 Wall Sections
A7.01 Wall Sections, Wall Details
A8.00 Interior Elevations
A8.01 Interior Elevations
A8.02 Interior Elevations
A8.03 Interior Elevations
A8.04 Interior Elevations
A8.05 Interior Elevations
A8.06 Interior Elevations
A8.07 Interior Elevations
A8.08 Interior Elevations
A8.09 Interior Elevations
A8.10 Interior Elevations
A8.11 Interior Elevations
A8.12 Interior Elevations
A9.00 Room Finish Schedule
A9.01 Finish Plan - Level 1
A9.02 Finish Plan - Level 2
A9.03 Finish Plan - Level 3
A10.00 Details - Site, Exterior, Miscellaneous
A10.01 Details - Wall Types, Miscellaneous
A10.03 Details, - Door Schedule, Door Types, Window Types
A10.04 Details - Interior, Proscenium, Acoustic Ceiling, Miscellaneous
A10.05 Details - Interior, Floor Transitions, Base, Trim, Miscellaneous
A10.06 Details - Interior, Miscellaneous Door, Miscellaneous
A10.07 Details - Casework
A10.08 Fixture Mounting Heights, Signage
A10.09 Details - Railings
TL0.1 Theater Lighting - General Information
TL1.0 Orchestra Pit - General Illumination Plan
TL1.1 Theater Lighting - Level 1 General Illumination Plan
TL1.3 Theater Lighting - Level 3 General Illumination Plan
TL2.0 Theater Lighting - Orchestra Pit Lighting Controls & Distribution Plan
TL2.1 Theater Lighting - Level 1 Lighting Control & Distribution Plan
TL2.2 Theater Lighting - Level 2 Lighting Controls & Distribution Plan
TL2.3 Theater Lighting - Level3 Lighting Control & Distribution Plan
TL3.1 Theater Lighting - New House Lighting - Section View
TL7.1 Theater Lighting - Lighting Control Interconnection Diagram - Line Voltage
TL8.1 Theater Lighting - Equipment Schedules
TL8.2 Theater Lighting - Equipment Schedules
TL8.3 Theater Lighting - Panel Schedules
TL8.4 Theater Lighting - House Lighting Fixture Schedule
TP1.1 Theater Production Fixtures Schedule
TP1.2 Theater Production Accessories Schedule
TR0.1 Theater Rigging General Information & Rigging Schedule
TR1.1 Theater Rigging Equipment Plans
TR1.2 Theater Rigging Equipment Plans
TR1.3 Theater Rigging Equipment Section
TR2.1 Theater Rigging Lineset Elevations
TR2.2 Theater Rigging Lineset Elevations
TR2.3 Theater Rigging Fire Safety Curtain Elevation
TR2.4 Theater Rigging Fire Safety Curtain Details
TR3.1 Theater Rigging Equipment Details
TR3.2 Theater Rigging Equipment Details
TR6.1 Theater Rigging Orchestra Pit Fillers - Plan & Details
TR6.2 Theater Rigging Orchestra Pit Fillers - Details
TR7.1 Theater Rigging Acoustic Reflectors & Towers - Plans
TR7.2 Theater Rigging Acoustic Reflectors & Towers - Section & Details
TS1.1 Theater Seating Level 1 Seating Plan, Schedule, & Notes
TS1.2 Theater Seating Balcony Seating Plan, Schedule, & Notes
TS1.3 Theater Seating Seating Section & Details
S1.00 Structural Notes
S1.01 Statement of Special Inspections
S1.02 Standard Details
S1.03 Standard Details
S1.04 Standard Details
S1.05 Plan Notes & Details
S2.00 Level 0 - Basement
S2.01 Level 1 - Auditorium
S2.02 Level 2 - Upper Lobby
S2.03 Level 3 - Balcony
S2.04 Level 4 - Catwalks
S2.05 Level 5 - Roof
S3.00 Foundation Details
S4.00 Steel Framing Details
S4.01 Steel Framing Details
S4.02 Steel Framing Details
S4.03 Steel Framing Details
S4.04 Steel Framing Details
S5.00 Catwalk Framing Details
S5.01 Catwalk Framing Details
S5.02 Catwalk Framing Details
S6.00 Masonry Wall Details
S6.01 Masonry Wall Elevations
S7.00 Braced Frame Details
M0.01 Mechanical Legends & Notes
M0.02 Mechanical Schedules I
M6.01 HVAC Plan - Level 1 - New Addition & Stage
M6.02 HVAC Plan - Level 2 - Lobby, Mechanical Platform, & New Addition Roof
M7.01 HVAC Details 1
M8.01 Mechanical Sections
MD1.01 Mechanical Demolition Drawings
P0.01 Plumbing Legends and Schedules
P3.01 Foundation Plumbing Plan - New Addition
P4.01 Plumbing Plan - Level 0 - Dressing Room
P4.02 Plumbing Plan - Level 1 - New Addition
P4.03 Plumbing Plan - Level 2 - Upper Lobby
P5.01 Enlarged Plumbing Plan - Restrooms
P7.01 Plumbing Details 1
P9.01 Plumbing Roof Plan
F1.01 Fire Protection Plans
E0.01 Electrical Symbol Schedule
E0.02 Common Device Grouping and Mounting Heights
E1.10 Oneline Diagram Building D
E1.11 Oneline Diagram Building B
E1.20 Lighting Fixture Schedule
E1.21 Lighting Fixture Details
E1.40 Panel Schedules - Building B
E1.41 Panel Schedules
E1.42 Panel Schedules
E1.43 Panel Schedules
E1.44 Panel Schedules
E1.51 Fire Alarm and Security Details
E1.52 Fire Alarm and Security Details
E1.61 Intercom / Clock Details
E1.62 Communications Details
E2.00 Level 0 - Basement - Lighting Plan
E2.01 Level 1 - Auditorium - Lighting Plan
E2.02 Level 2 - Upper Lobby - Lighting Plan
E2.03 Level 3 - Balcony - Lighting Plan
E2.04 Level 4 - Catwalks - Lighting Plan
E3.00 Level 0 - Basement - Power Plan
E3.01 Level 1 - Auditorium - Power Plan
E3.02 Level 2 - Upper Lobby - Power Plan
E3.03 Level 3 - Balcony - Power Plan
E3.04 Level 4 - Catwalks - Power Plan
E4.01 Electrical Building Section
E5.00 Level 0 - Basement - Fire Alarm & Security Plan
E5.01 Level 1 - Auditorium - Fire Alarm & Security Plan
E5.02 Level 2 - Upper Lobby - Fire Alarm & Security Plan
E5.03 Level 3 - Balcony - Fire Alarm & Security Plan
E5.04 Level 4 - Catwalks - Fire Alarm & Security Plan
E6.00 Level 0 - Basement - Communications & A/V Plan
E6.01 Level 1 - Auditorium - Communications & A/V Plan
E6.02 Level 2 - Upper Lobby - Communications & A/V Plan
E6.03 Level 3 - Balcony - Communications & A/V Plan
E6.04 Level 4 - Catwalks - Communications & A/V Plan
ED1.00 Existing / Demolition Plan - Level 0
ED1.01 Existing / Demolition Plan - Level 1
ED1.02 Existing / Demolition Plan - Level 2
ED1.03 Existing / Demolition Plan - Level 3
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.