This document has 467 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000103 Project Directory
Page 5 Section 000107 Seals Page
Page 7 Section 000110 Table of Contents
Page 12 Advertisement for Bids
Page 16 Plan Center List
Page 17 Agenda for Pre-Bid Walk-Through
Page 20 Preconstruction Checklist
Page 28 Instructions to Bidders
Page 40 Bidding Terms & Conditions
Page 43 Wage Theft Prevention - Responsible Bidder Criteria
Page 44 Subcontractor List Form A - for HVAC, Plumbing & Electrical
Page 45 Subcontractor List Form B - for Structural Steel Installation & Rebar Installation
Page 46 Division 00 Supplemental Bidder - Responsibility Criteria
Page 48 Form 1 Contractor Experience Detail
Page 49 Form 2 Resume of Key Personnel for Proposed Contract
Page 51 Form 3 Prime Contractor Diverse Business Inclusion Plan
Page 53 Form 4 Apprenticeship Utilization
Page 54 Apprentice Utilization Plan
Page 56 Form 5 Reference Evaluation Questionnaire
Page 57 Form 6 Supplemental Responsibility Criteria Evaluation Score Sheet
Page 58 Section 007200 General Conditions for Washington State Facility Construction / Small Works
Page 109 Certificate of Liability Insurance
Page 110 Section 005433 Digital Electronic Data Protocol Exhibit
Page 113 Invoice Voucher A19-1A Instructions
Page 114 Form A19-2AE2 Invoice Voucher
Page 115 Section 006313 Request for Information
Page 116 Facilities Professional Services (FPS) Construction Field Authorization (FA)
Page 117 Contract Change Order Proposal (COP)
Page 118 Section 006373 Request for Equitable Adjustment in Contract Time
Page 121 Section 007343 Wage Rate Requirements
Page 123 Washington State Prevailing Wage
Page 124 Section 009100 Available Project Information
Page 126 Limited Hazardous Materials Survey Report
Page 154 Geotechnical Engineering Report
Page 169 Supplemental Geotechnical Information - Infiltration Potential
Page 179 Section 011000 Summary
Page 183 Section 012000 Price & Payment Procedures
Page 186 Section 012050 Contract Modification Procedures
Page 188 Section 012300 Alternates
Page 189 Section 012500 Substitution Procedures
Page 192 Section 012503 Substitution Request Form
Page 194 Section 013000 Administrative Requirements
Page 204 Required Submittals Schedule
Page 205 Section 013216 Construction Progress Schedule
Page 208 Section 013553 Project Security Procedures
Page 217 Online Background Check Authorization Form Instructions
Page 218 Guide to Preventing & Reporting Sexual Misconduct
Page 220 PREA Information
Page 221 PREA Sexual Misconduct Disclosure
Page 222 PREA Completion of Training & Policy Review
Page 223 Section 014000 Quality Requirements
Page 229 Section 014100 Regulatory Requirements
Page 231 Section 014200 References
Page 236 Section 014216 Definitions
Page 237 Section 015000 Temporary Facilities & Controls
Page 245 Section 016000 Product Requirements
Page 250 Section 017000 Execution Requirements
Page 256 Section 017329 Cutting & Patching
Page 261 Section 017400 Cleaning & Waste Management
Page 266 Section 017800 Closeout Submittals & Procedures
Page 272 Substantial Completion Checklist
Page 273 Certificate of Substantial Completion
Page 274 Final Acceptance Checklist
Page 275 Section 024113 Selective Site Demolition
Page 277 Section 024119 Selective Demolition
Page 283 Section 033053 Miscellaneous Cast-In-Place Concrete
Page 289 Section 035419 Calcium-Aluminate Cement Underlayment
Page 292 Section 055000 Metal Fabrications
Page 298 Section 061000 Rough Carpentry
Page 304 Section 061600 Sheathing
Page 306 Section 062023 Interior Finish Carpentry
Page 313 Section 064100 Architectural Wood Cabinets
Page 320 Section 072100 Thermal Insulation
Page 324 Section 072715 Nonbituminous Self-Adhering Sheet Air Barriers
Page 329 Section 074113.16 Standing-Seam Metal Roof Panels
Page 336 Section 074646 Fiber-Cement Siding
Page 340 Section 079200 Joint Sealants
Page 349 Section 079219 Acoustical Joint Sealants
Page 353 Section 081113 Hollow Metal Doors & Frames
Page 358 Section 084213 Aluminum-Framed Entrances
Page 366 Section 084313 Aluminum-Framed Storefronts
Page 374 Section 085653 Security Windows
Page 379 Section 087163 Door Hardware
Page 395 Section 088700 Glazing Surface Films
Page 399 Section 088853 Security Glazing
Page 405 Section 090561 Common Work Results for Flooring Preparation
Page 408 Section 092900 Gypsum Board
Page 415 Section 095100 Acoustical Ceilings
Page 419 Section 096513 Resilient Base & Accessories
Page 422 Section 096813 Tile Carpeting
Page 427 Section 096913 Rigid-Grid Access Flooring
Page 433 Section 098100 Acoustical Insulation
Page 436 Section 099000 Painting & Coating
Page 441 Section 099600 High-Performance Coatings
Page 445 Section 101419 Dimensional Letter Signage
Page 449 Section 102641 Bullet Resistant Panels
Page 451 Section 105113 Metal Lockers
Page 455 Section 111200 Parking Control Equipment
Page 462 Section 123661.16 Solid Surfacing Countertops