Ori Roosevelt, Seattle, WA - Phase 2 Final Bid Set Plans
Cover Sheet
T0.000.06 Sheet Index
T0.001 Abbreviations
T0.002 Project Data
T1.004 Zoning Code Information
T1.005 Zoning - Pre-App Conference Notes
T1.101 Zoning - Project Tabulations
T1.102 Zoning - Gross Floor Area Measurements
T1.103 Zoning - Amenity Area
T1.104 Zoning Diagrams
T1.105 Zoning Diagrams - Bicycle Parking
T1.106 SPU - Solid Waste
T2.001 Building Code Compliance Notes
T2.002A ENV-UA Compliance Documents
T2.002B ENV-UA Compliance Documents
T2.003 Fire Separation Diagrams - Elevation
T2.004 Fire Separation Diagrams - Plan
T2.005 Fire Separation Diagrams - Section
T2.006 Life Safety Plans - L01-L03
T2.007 Life Safety Plans - L04-L06
T2.008 Life Safety Plans - L07-Roof
T3.001 Accessibility Notes / Mounting Heights / Electrical
T3.002 Accessibility Route & Doors
T3.003 Accessibility Public Spaces
T3.004 Accessibility Notes & Diagrams - Type A Units
T3.005 Accessibility Notes & Diagrams - Type B Units
SH0.100 Shoring Notes
SH1.100 Shoring Plan
SH2.100 West Shoring Wall Sections
SH2.101 North Shoring Wall Sections
C1.000 Demolition Plan
C2.000 Erosion & Sediment Control Plan
C3.000 Civil Site Plan
C3.001 Civil Site Details
C4.000 Foundation Drainage Plan
L1.00 Landscape Plan - Street Level
L1.10 Landscape Details
L1.20 Landscape Plan - Roof Level
L2.00 Colored Landscape Plan - Street Level
L2.10 Colored Landscape Plan - Roof
L3.00 Irrigation Plans
L3.10 Irrigation Details
L4.00 Seattle Green Factor
A1.001 Site Plan
A1.101 Level 01 Floor Plan
A1.102 Level 02 Floor Plan
A1.103 Level 03 Floor Plan
A1.104 Level 04 Floor Plan
A1.105 Level 05 Floor Plan
A1.106 Level 06 Floor Plan
A1.107 Level 07 Floor Plan
A1.108 Roof Floor Plan
A1.109 Roof Mechanical Floor Plan
A1.120 Level 01, 02, 03, 07 Drainage Plan
A1.121 Roof, Roof Mechanical Drainage Plan
A1.201 Level 01 Slab Plan
A1.202 Level 02 Slab Plan
A1.203 Level 03 Slab Plan
A1.301 Level 01 Reflected Ceiling Plan
A1.302 Level 02 Reflected Ceiling Plan
A1.303 Level 03 Reflected Ceiling Plan
A1.304 Level 04 Reflected Ceiling Plan
A1.305 Level 05 Reflected Ceiling Plan
A1.306 Level 06 Reflected Ceiling Plan
A1.307 Level 07 Reflected Ceiling Plan
A1.308 Roof Level Reflected Ceiling Plan
A1.401 Unit Plans - Studio
A1.402 Unit Plans - Studio
A1.403 Unit Plans - 1BR
A1.404 Unit Plans - 1BR
A1.405 Unit Plans - 2BR
A1.406 Unit Plans - 2BR
A1.451 Type A Unit Plans - Studio
A1.452 Type A Unit Plans - 1BR & 2BR
A1.501 SCL - Transformer Vault
A1.502 Bio-Retention Plan, Sections, Elevations
A1.601 Enlarged Lobby Plan & Reflected Ceiling Plan
A2.101 North & East Elevations
A2.102 South & West Elevations
A2.103 Stair & Elevator Penthouse Elevations
A2.201 Enlarged Retaining Wall Elevations
A3.101 Building Sections
A3.102 Building Sections
A3.301 Wall Sections
A3.302 Wall Sections
A3.303 Wall Sections
A3.304 Wall Sections
A4.101 Core, Stair 1 & Stair 2 Plans
A4.102 Core, Stair 1 & Stair 2 Sections
A4.103 Elevator Core Plans
A4.104 Stair Details
A4.105 Stair & Shaft Details
A4.106 Enlarged Shafts & Trash, Electrical / IDF, Elevator Control Room Plans
A4.107 Enlarged Shaft Plans
A4.301 Bicycle Storage - Plans, Sections & Elevations
A4.302 Bicycle Storage - Plans, Sections & Elevations
A5.101 Wall Assemblies - Exterior
A5.103 Interior Wall Assemblies - Wood
A5.104 Interior Wall Assemblies - Wood
A5.105 Interior Wall Assemblies - Metal
A5.201 Floor / Roof Assemblies
A5.202 Ceiling Assemblies
A5.301 Exterior Details - Below & at Grade Concrete
A5.302 Exterior Details - Below & at Grade Concrete
A5.303 Exterior Details - Below & at Grade Concrete
A5.304 Exterior Details - Below & at Grade Concrete
A5.401 Exterior Details - Building Type I - Storefront
A5.402 Exterior Details - Building Type I
A5.403 Exterior Details - Building Type I
A5.404 Exterior Details - Building Type I
A5.405 Exterior Details - Building Type I
A5.406 Exterior Details - Building Type I
A5.409 Exterior Details - Building Type V - Windows
A5.410 Exterior Details - Building Type V - Cladding
A5.411 Exterior Details - Building Type V - Exterior Vents
A5.412 Exterior Details - Building Type V - Balconies
A5.413 Exterior Details - Building Type V - Balconies
A5.601 Roof Details
A5.602 Roof Details
A5.603 Roof Details
A5.604 Roof Details
A5.701 Exterior Details - Miscellaneous
A5.702 Exterior Details - Gas Meter
A5.703 Exterior Details - Mechanical Screening
A5.704 Exterior Details - Railing
A5.801 Interior Details - Ceilings
A5.802 Interior Door Details - Units
A5.803 Door Details - Common Areas
A5.804 Interior Details - Fire Protection
A5.805 Interior Details - Units
A5.806 Interior Details - Partitions
A6.101 Door Schedule
A6.201 Window & Louver Schedule
A6.301 Storefront Schedule
S0.100 General Structural Notes
S0.101 General Structural Notes
S0.102 General Structural Notes
S0.103 Wind Loading Diagrams & Reinforce Splices
S0.104 Verifications & Special Inspections
S0.105 Verifications & Special Inspections
S1.101 Level 01 Foundation Plan
S1.102 Level 02 Concrete Framing Plans
S1.103 Level 03 Concrete Framing Plans
S1.103W Level 03 Wood Framing Plan
S1.104 Level 04 Framing Plan
S1.105 Level 05 Framing Plan
S1.106 Level 06 Framing Plan
S1.107 Level 07 Framing Plan
S1.108 Roof Framing Plans
S3.101 Typical Concrete Details
S3.102 Concrete Details
S3.103 Miscellaneous Concrete Details
S3.104 Post-Tensioned Slab Details
S3.105 Post-Tensioned Slab Details
S4.101 Wood Framing Schedules & Details
S4.102 Framing Details & Elevator Details
S4.103 Roof Framing & Holdown Details
S4.104 Miscellaneous Framing Details
S5.101 Steel Framing Details
BE0.000 General Notes
BE0.100 Air Barrier Diagrams - Plans
BE0.101 Air Barrier Diagrams - Plans
BE0.200 Air Barrier Diagrams - Sections
BE0.300 Waterproofing Assemblies
BE0.400 Waterproofing Extents - Plans
BE0.401 Waterproofing Extents - Plans
BE0.500 Waterproofing Extents - Sections
BE1.00 Below Grade Details
BE1.01 Below Grade Details
BE2.00 Wall Details
BE3.00 Window Installation Sequence
BE3.01 Window, Doors & Louver Details
BE5.00 Roofing Details
BE5.01 Roofing Details
M1.001 Legend & Notes
M1.002 Schedules
M1.101 1st Floor HVAC Plan
M1.102 2nd Floor HVAC Plan
M1.103 3rd Thru 7th Floor HVAC Plan
M1.108 Roof HVAC Plan
M1.109 Mechanical Roof HVAC Plan
M1.401 Unit HVAC Plans
M1.501 Details
P1.001 Legend & Notes
P1.002 Schedules
P1.003 Schedules Continued
P1.004 Plumbing Calculations
P-100 Foundation Plumbing Plan
P1.101 First Floor Plumbing Plan
P1.102 2nd Floor Plumbing Plan
P1.103 3rd Floor Plumbing Plan
P1.104 4th Floor Plumbing Plan
P1.105 5th Floor Plumbing Plan
P1.106 6th Floor Plumbing Plan
P1.107 7th Floor Plumbing Plan
P1.108 Roof Plumbing Plan
P1.109 Mechanical Roof Plumbing Plan
P1.501 Details
P1.502 Details Continued
P1.503 Details Continued
P1.601 Riser Diagrams
P1.602 Riser Diagrams
P1.603 Riser Diagrams
P1.604 Riser Diagrams
P1.605 Riser Diagrams
E1.000 Cover Page
E1.101 Level 1 Lighting
E1.102 Level 2 Lighting
E1.103 Level 3 Lighting
E1.104 Level 4 Lighting
E1.105 Level 5 Lighting
E1.106 Level 6 Lighting
E1.107 Level 7 Lighting
E1.108 Roof Plan Lighting
E1.200 Basement Slab Conduit Plan
E1.201 Level 1 Power
E1.202 Level 2 Power
E1.203 Level 3 Power
E1.204 Level 4 Power
E1.205 Level 5 Power
E1.206 Level 6 Power
E1.207 Level 7 Power
E1.208 Roof Plan Power
E1.209 Mechanical Room Roof Plan Power
E1.300 Units
E1.400 Details
E1.500 One-Line
E1.501 Calculations
E1.502 Calculations
FP-1 Fire Sprinkler Plans - Cover Page
FP-2 Fire Sprinkler Plans - Level 1 & 2
FP-3 Fire Sprinkler Plans - Level 3 & 4
FP-4 Fire Sprinkler Plans - Level 5 & 6
FP-5 Fire Sprinkler Plans - Level 7 & 8 (Roof)
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.