Willapa Hills State Park Trail - Pacific County Surfacing Phase 1, Pacific County, WA #NW-C4319 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 134 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Table of Contents
Page 4 Advertisement for Bid
Page 7 Invitation to Bid
Page 10 Instructions to Bidders
Page 28 Bidder Compliance Form
Page 29 Bid Form
Page 31 MWBE, Washington Small Business, Veteran-Owned Business Utilization Certification
Page 32 Subcontractor Utilization List
Page 34 Bid Bond Requirements
Page 35 Summary of Pay Items and Quantities
Page 37 Supplemental Bidder Responsibility Criteria with Inclusion Plan and Apprenticeship Requirements
Page 39 Form 1 - Contractor Experience Detail
Page 40 Form 2 - Resume of Key Personnel
Page 42 Form 3 - Prime Contractor Diverse Business Inclusion Plan
Page 44 Form 4 - Apprenticeship Utilization
Page 45 Form 5 - Reference Evaluation Questionnaire
Page 46 Form 6 - Supplemental Responsibility Criteria Evaluation Score Sheet
Page 47 General Conditions for Construction at Washington State Parks
Page 90 Prevailing Wages
Page 91 Section 010000 General Requirements
Page 96 Section 013300 Submittal Procedures
Page 97 Section 013501 Inadvertent Discoveries of Cultural Resources and Human Skeletal Remains
Page 102 Section 014000 Quality Requirements
Page 109 Section 014100 Regulatory Requirements
Page 111 Section 014200 References
Page 114 Section 015000 Temporary Facilities and Controls
Page 119 Section 015526 Traffic Control
Page 121 Section 016000 Product Requirements
Page 124 Section 017419 Construction Waste Management and Disposal
Page 125 Section 017700 Closeout Procedures
Page 128 Section 312500 Erosion and Sedimentation Control
Page 132 Section 321140 Crushed Surfacing