Page 1 Cover Page
Page 3 Table of Contents
Page 10 Advertisement for Bid
Page 13 Invitation to Bid
Page 16 Instructions to Bidders
Page 34 Bidder Compliance Form
Page 35 Bid Form
Page 37 MWBE, WA Small Business, Veteran-Owned Business Utilization Certification
Page 38 Subcontractor Utilization List
Page 40 Bid Bond Requirements
Page 41 Summary of Pay Items & Quantities
Page 43 Supplemental Bidder Responsibility Criteria with Inclusion Plan & Apprenticeship Requirements
Page 45 Form 1 Contractor Experience Detail
Page 46 Form 2 Resume of Key Personnel
Page 48 Form 3 Prime Contractor Diverse Business Inclusion Plan
Page 51 Form 4 Apprenticeship Utilization
Page 52 Form 5 Reference Evaluation Questionnaire
Page 53 Form 6 Supplemental Responsibility Criteria Evaluation Score Sheet
Page 55 General Conditions for Construction at Washington State Parks
Page 98 Prevailing Wages
Page 99 Appendix A Geotechnical Engineering Services
Page 203 Appendix B Earthwork Calculations
Page 209 Appendix D Nisqually State Park Lead Assessment of Borrow Pit
Page 243 Appendix E Kubota Scope & Plans
Page 278 Section 010000 General Requirements
Page 283 Section 010099 Surveying
Page 285 Section 010100 Schedule of Major Equipment Items Basis of Bid
Page 286 Section 010101 Substitution of Major Equipment Items General
Page 289 Section 013000 Administrative Procedures
Page 292 Section 013110 Project Management Coordination
Page 295 Section 013300 Submittal Procedures
Page 298 Section 013500 Project Meetings
Page 301 Section 013501 Inadvertent Discoveries of Cultural Resources & Human Skeletal Remains
Page 306 Section 013573 Delegated Design Procedures
Page 311 Section 013600 Digital File Request Form
Page 312 Electronic Media Release
Page 313 Section 014000 Quality Requirements
Page 321 Section 014100 Regulatory Requirements
Page 323 Section 014200 References
Page 327 Section 014300 Inspections & Test
Page 330 Section 014339 Mockups
Page 335 Section 014521 Manufacturer's Services
Page 338 Section 014524 Installation, Testing, Commissioning & Training
Page 347 Section 014525 Installation, Testing & Commissioning for MBR Equipment
Page 350 Section 015000 Temporary Facilities & Controls
Page 358 Section 015100 Field Engineering
Page 359 Section 015526 Traffic Control
Page 361 Section 015639 Temporary Tree & Plant Protection
Page 368 Section 015713 Temporary Erosion & Sedimentation Control
Page 375 Section 016000 Product Requirements
Page 379 Section 016001 Product Submission Request
Page 382 Section 017329 Cutting & Patching
Page 386 Section 017419 Construction Waste Management Disposal
Page 388 Section 017423 Tank Cleaning & Final Cleaning
Page 390 Section 017700 Closeout Procedures
Page 393 Section 017839 Project As-Built Drawings
Page 395 Section 024119 Selective Demolition
Page 401 Section 031000 Concrete Forming & Accessories
Page 408 Section 031100 Concrete Forming (For Schedule B Only)
Page 412 Section 031513 Waterstops (For Schedule B Only)
Page 415 Section 031516 Expansion, Contraction & Control Joints (For Schedule B Only)
Page 417 Section 031519 Anchors, Inserts & Embedded Products (For Schedule B Only)
Page 419 Section 032000 Concrete Reinforcing
Page 424 Section 032000.1 Concrete Reinforcing (For Schedule B Only)
Page 426 Section 033000 Cast-In-Place Concrete - Architecture
Page 443 Section 033000.1 Cast-In-Place Concrete - Sitework
Page 479 Section 033000.2 Cast-In-Place Concrete (For Schedule B Only)
Page 490 Section 033010 Portland Cement Concrete Paving
Page 497 Section 033130 Cementitious Waterproofing (For Schedule B Only)
Page 500 Section 033301 Hydraulic Structure Water Leakage Testing (For Schedule B Only)
Page 502 Section 033543 Polished Concrete Finishing
Page 511 Section 034810 Precast Concrete Vaults (For Schedule B Only)
Page 514 Section 034820 Wet Well (For Schedule B Only)
Page 516 Section 036000 Grouting (For Schedule B Only)
Page 523 Section 042200 Concrete Unit Masonry
Page 536 Section 042200.1 Concrete Unit Masonry (For Schedule B Only)
Page 545 Section 051220 Structural Steel (For Schedule B Only)
Page 548 Section 055000 Metal Fabrications
Page 557 Section 055000.1 Metal Fabrications (For Schedule B Only)
Page 560 Section 055116 Galvanizing (For Schedule B Only)
Page 563 Section 055119 Metal Grating Stairs
Page 571 Section 055213 Pipe & Tubing Rails
Page 581 Section 061000 Rough Carpentry
Page 593 Section 061053 Miscellaneous Rough Carpentry
Page 600 Section 061113 Engineered Wood Products (For Schedule B Only)
Page 603 Section 061600 Sheathing
Page 614 Section 061753 Shop-Fabricated Wood Trusses
Page 621 Section 062020 Rough Carpentry (For Schedule B Only)
Page 627 Section 064023 Interior Architectural Woodwork
Page 639 Section 065000 Structural Plastics (For Schedule B Only)
Page 641 Section 067500 Fiberglass Reinforced Plastic (FRP) Flat Odor Control Tank Covers (For Schedule B Only)
Page 647 Section 070543 Cladding Support Systems
Page 654 Section 071700 Bentonite Waterproofing
Page 660 Section 071900 Water Repellents
Page 665 Section 072100 Thermal Insulation
Page 674 Section 072500 Weather Barriers
Page 676 Section 073013 Roofing Underlayments
Page 679 Section 074114.16 Standing-Seam Metal Roof Panels
Page 690 Section 074213.13 Formed Metal Wall Panels
Page 699 Section 074293 Soffit Panels
Page 704 Section 074646 Fiber-Cement Siding
Page 710 Section 076200 Sheet Metal Flashing & Trim
Page 726 Section 076500 Flexible Flashing
Page 730 Section 078100 Applied Fire Protection
Page 737 Section 079200 Joint Sealants
Page 749 Section 079513 Expansion Joint Cover Assemblies
Page 756 Section 081113 Hollow Metal Doors & Frames
Page 766 Section 083613 Sectional Doors
Page 775 Section 085113 Aluminum Windows
Page 783 Section 086200 Unit Skylights
Page 789 Section 087100 Door Hardware
Page 809 Section 088000 Glazing
Page 818 Section 089000 Louvers - Schedule B Only
Page 823 Section 089119 Fixed Louvers
Page 830 Section 092900 Gypsum Board
Page 840 Section 093013 Ceramic Tiling
Page 855 Section 098100 Acoustical Insulation
Page 862 Section 099000 Painting & Coating
Page 876 Section 099600 High-Performance Coatings
Page 886 Section 099623 Graffiti-Resistant Coatings
Page 891 Section 101401 Regulatory Signage - Sitework
Page 895 Section 101423 Panel Signage
Page 899 Section 101423.16 Room-Identification Panel Signage
Page 903 Section 101424 Panel Signage - Sitework
Page 909 Section 102613 Corner Guards
Page 913 Section 102623 Protective Wall Covering
Page 917 Section 102813 Toilet & Bath Accessories
Page 926 Section 104413 Fire Protection Cabinets
Page 930 Section 104416 Fire Extinguishers
Page 933 Section 113013 Residential Appliances
Page 938 Section 123623.13 Plastic-Laminate-Clad Countertops
Page 945 Section 130541 Seismic Restraint Requirements for Non-Structural Components (For Schedule B Only)
Page 947 Section 131147 Fiberglass Life Ring Enclosures (For Schedule B Only)
Page 949 Section 133419 Metal Building Systems
Page 976 Section 210500 General Fire Suppression Requirements
Page 988 Section 211000 Fire Sprinkler System
Page 995 Section 220000 Plumbing (For Schedule B Only)
Page 1004 Section 220500 General Plumbing Requirements
Page 1016 Section 220510 Excavation & Backfill
Page 1022 Section 220519 Piping Specialties
Page 1024 Section 220520 Pipe & Pipe Fittings
Page 1029 Section 220529 Piping Hangers & Supports
Page 1033 Section 220530 Piping Sleeves & Seals
Page 1035 Section 220548 Piping Vibration & Seismic Control
Page 1037 Section 220700 Piping Insulation
Page 1042 Section 221100 Domestic Water Piping System
Page 1049 Section 221123 Pumps
Page 1051 Section 221300 Soil Waste & Vent Piping System
Page 1056 Section 224000 Plumbing Fixtures & Trim
Page 1067 Section 230500 General HVAC Requirements
Page 1078 Section 230529 HVAC Hangers & Supports
Page 1082 Section 230548 HVAC Vibration & Seismic Control
Page 1085 Section 230593 Air & Hydronic Balancing
Page 1091 Section 230700 HVAC Insulation
Page 1095 Section 230900 HVAC Controls
Page 1101 Section 233100 Ductwork
Page 1106 Section 233113 Metal Ductwork & Accessories (For Schedule B Only)
Page 1113 Section 233300 Air Duct Accessories
Page 1116 Section 233400 Fans
Page 1120 Section 233700 Air Outlets & Inlets
Page 1126 Section 238110 Heating, Ventilating & Air Conditioning (HVAC) (For Schedule B Only)
Page 1135 Section 238300 Electric Space Heating Equipment
Page 1138 Section 260126 Maintenance Testing for Electrical Systems
Page 1141 Section 260500 Common Work Results for Electrical Systems
Page 1156 Section 260511 Basic Electrical Methods & Materials (For Schedule B Only)
Page 1165 Section 260519 Low-Voltage Electrical Power Conductors & Cables
Page 1170 Section 260519.1 Low-Voltage Electrical Power Conductors & Cables (For Schedule B Only)
Page 1174 Section 260523 Signal Cable (For Schedule B Only)
Page 1182 Section 260526 Grounding & Bonding for Electrical Systems
Page 1185 Section 260526.1 Grounding & Bonding of Electrical Systems (For Schedule B Only)
Page 1187 Section 260529 Hangers & Supports for Electrical Systems (For Schedule B Only)
Page 1190 Section 260533 Raceway & Boxes for Electrical Systems
Page 1198 Section 260533.1 Raceway & Boxes for Electrical Systems (For Schedule B Only)
Page 1207 Section 260553 Identification for Electrical Systems (For Schedule B Only)
Page 1209 Section 260573 Overcurrent Protective Device Coordination Study (For Schedule B Only)
Page 1212 Section 260913 Electrical Power Monitoring & Control (For Schedule B Only)
Page 1214 Section 260995 Push Buttons, Selector Switches & Pilot Lights (For Schedule B Only)
Page 1217 Section 260996 Electrical Systems Control Devices (For Schedule B Only)
Page 1219 Section 262213 Low-Voltage Distribution Transformers (For Schedule B Only)
Page 1221 Section 262416 Panelboards
Page 1224 Section 262416.1 Panelboards (For Schedule B Only)
Page 1227 Section 262419 Motor-Control Centers (For Schedule B Only)
Page 1231 Section 262726 Wiring Devices (For Schedule B Only)
Page 1234 Section 262800 Low-Voltage Circuit Protective Devices (For Schedule B Only)
Page 1237 Section 262816 Enclosed Switches & Circuit Breakers (For Schedule B Only)
Page 1240 Section 262913.13 Across-The-Line Motor Controllers (For Schedule B Only)
Page 1243 Section 263213 Engine Generators (For Schedule B Only)
Page 1251 Section 263600 Transfer Switches (For Schedule B Only)
Page 1254 Section 264300 Surge Protective Devices (For Schedule B Only)
Page 1256 Section 265000 Lighting
Page 1264 Section 265629 Site Lighting (For Schedule B Only)
Page 1267 Section 266020 Electrical Service (For Schedule B Only)
Page 1269 Section 269592 Relays (For Schedule B Only)
Page 1275 Section 271000 Telecommunications Cabling
Page 1293 Section 283100 Fire Detection & Alarm
Page 1309 Section 283100.1 Fire Alarm System (For Schedule B Only)
Page 1314 Section 310000 Earthwork
Page 1323 Section 310513 Aggregates for Earthwork
Page 1326 Section 311100 Clearing & Grubbing
Page 1331 Section 312000 Earth Moving
Page 1341 Section 312000.1 Earth Moving (For Schedule B Only)
Page 1353 Section 312100 Borrow Pit
Page 1356 Section 312319 Dewatering (For Schedule B Only)
Page 1358 Section 312500 Erosion & Sediment Controls (For Schedule B Only)
Page 1360 Section 321200 Flexible Paving (For Schedule B Only)
Page 1362 Section 321216 Asphalt Paving
Page 1366 Section 321500 Crushed Rock Surfacing
Page 1369 Section 321713 Wheel Stops
Page 1372 Section 321723 Pavement Markings
Page 1375 Section 323100 Fences & Gates (For Schedule B Only)
Page 1381 Section 323113 Chain Link Fences & Gates
Page 1388 Section 323116 Security Cantilevered Slide Gates
Page 1396 Section 323253 Landscape Boulders
Page 1399 Section 323300 Site Furnishings
Page 1403 Section 323913 Fixed Bollard
Page 1405 Section 329000 Planting (For Schedule B Only)
Page 1409 Section 329113 Bark Mulch & Wood Chips
Page 1411 Section 329119 Topsoil Placement & Grading
Page 1416 Section 329200 Seed Mix
Page 1425 Section 329300 Plants
Page 1434 Section 331100 Water Utility Distribution Piping (For Schedule B Only)
Page 1441 Section 331300 Water Distribution Piping
Page 1445 Section 331443 Packaged Pumping System
Page 1460 Section 331600 Water Storage Tank
Page 1470 Section 331600.1 Storage Tanks (For Schedule B Only)
Page 1474 Section 331700 Non-Potable Water Distribution System (For Schedule B Only)
Page 1480 Section 333100 Sanitary Utility Sewerage Piping (For Schedule B Only)
Page 1483 Section 333217 Packaged Non-Potable Water Pumping Stations (For Schedule B Only)
Page 1492 Section 333300 Sanitary Sewers
Page 1496 Section 333500 Sanitary Utilities Valves, Gates & Appurtenances (For Schedule B Only)
Page 1506 Section 334000 Stormwater Utilities
Page 1509 Section 338000 RV Utility Pedestal
Page 1512 Section 400500 Process Piping (For Schedule B Only)
Page 1522 Section 400506 Piping Connections (For Schedule B Only)
Page 1530 Section 400531 Thermoplastic Pipe (For Schedule B Only)
Page 1534 Section 400533 High Density Polyethylene Pipe (For Schedule B Only)
Page 1539 Section 404100 Process Piping Equipment Heat Tracing (For Schedule B Only)
Page 1541 Section 409020 Process Control System for Wastewater Treatment Plant (For Schedule B Only)
Page 1544 Section 409113.23 Gas Analysis Measurement Devices (For Schedule B Only)
Page 1547 Section 409123.33 Flow Process Measurement Devices (For Schedule B Only)
Page 1550 Section 409123.36 Level Process Measurement Devices (For Schedule B Only)
Page 1553 Section 409443 Programmable Logic Process Controllers (For Schedule B Only)
Page 1557 Section 409513 Process Control Panels & Hardware (For Schedule B Only)
Page 1561 Section 409515 Process Control Panel Enclosures (For Schedule B Only)
Page 1563 Section 409543 Process Control Hardware Interfaces (For Schedule B Only)
Page 1565 Section 409574 Process Control Signal Conditioners Converters (For Schedule B Only)
Page 1567 Section 409580 Process Control Surge Protectors (For Schedule B Only)
Page 1570 Section 409588 Power Supply Systems (For Schedule B Only)
Page 1573 Section 409712 Process Control Alarm Dialers (For Schedule B Only)
Page 1575 Section 409796 Process Switches (For Schedule B Only)
Page 1578 Section 412200 Cranes & Hoists (For Schedule B Only)
Page 1586 Section 432500 Influent Pump Station (For Schedule B Only)
Page 1597 Section 432520 MBR Feed Pump Station (For Schedule B Only)
Page 1605 Section 443000 Odor Control (For Schedule B Only)
Page 1610 Section 444276 Wastewater Samplers (For Schedule B Only)
Page 1612 Section 462010 Water Treatment Equipment