Project #WPK96          Bid Date: 5/16/2024 @ 1:00 pm PDT

Nisqually State Park - New Full Service Park - Phase 2, Pierce County, WA #NW-C1218

$8,770,000 to $10,330,000

Low Bid:
Bids Received: 5
Apparent Low BidBerschauer Group Inc.$ 8,166,000.00
2ndNeeley Construction Co. $ 8,337,000.00
3rdPease Construction, Inc.$ 9,117,493.75

Plans
Specs
Pre-Bid Conference Agenda
Pre-Bid Walk-Thru Sign-In Sheet and Questions & Answers
Correction to Pre-Bid Walk-Thru Sign-In Sheet
Bid Clarifications
Bid Clarifications #2
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plans
Bid Results

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Washington State Parks and Recreation Commission
1111 Israel Road SW
Post Office Box 42650
Olympia, WA 98504-2650
360-902-8500
BidBox@parks.wa.gov

Issued by:
www.bxwa.com

Landscape Architect:
RWD Landscape Architects
4405 7th Avenue, SE
Lacey, WA 98503
360-456-3813

Contact: Bob Droll
bob@rwdroll.com

Prebid: 5/2 @ 10:00 am at Nisqually State Park Maintenance Building

Description:
This project includes a new Administration Building, new Staff Residence, and Roadway Improvements to the Nisqually River and Ohop Creek. Work includes, but is not limited to, site preparation, erosion control, excavation, utility improvements, construction of buildings and structures, aggregates, cast-in-place concrete, asphalt paving, catch basins and subsurface drainage, topsoil, restoration plantings and miscellaneous site improvements.