Bel-Red Road Buffered Bike Lanes, City of Redmond, WA #2329 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 345 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Call for Bids
Page 5 Information and Checklist for Bidders
Page 9 Bid Proposal
Page 19 Bid Proposal Signature Page
Page 20 Bid Security
Page 21 Non-Collusion Affidavit
Page 22 Subcontractor List
Page 23 Responsible Bidder Determination Form
Page 25 Certification of Compliance with Wage Payment Statutes
Page 26 Employee Apprenticeship Program (EAP) Utilization Plan
Page 29 Agreement
Page 31 Declaration of Authority to Sign
Page 32 Public Works Payment Bond
Page 34 Performance Bond
Page 36 Declaration of Option for Management of Statutory Retained Percentage
Page 37 Interest Bearing Escrow Account / Escrow Agreement
Page 39 Bond in Lieu of Retained Funds
Page 41 Special Provisions
Page 43 Introduction to the Special Provisions
Page 45 Division 1 General Requirements
Page 106 Division 2 Earthwork
Page 110 Division 4 Bases
Page 111 Division 5 Surface Treatments and Pavements
Page 139 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 150 Division 8 Miscellaneous
Page 176 Division 9 Materials
Page 183 Appendix A Prevailing Wage Rates
Page 184 Washington State Prevailing Wage Rates - King County
Page 195 Benefit Code Key
Page 213 Appendix B Standard Plans and Details
Page 274 Appendix C Contacts
Page 278 Appendix D Environmental Permits and Information
Page 285 Appendix E Pavement Investigation
Page 302 Appendix F Potholing Results
Page 322 Appendix G Traffic Control Plans
Page 344 Appendix H Schedule B Alternate Plans