Project #BOT88          Bid Date: 6/3/2026 @ 11:00 am PDT

Riverside HVOC Site In Situ Groundwater Treatment, City of Bothell, WA #0019.05.T007.ST1

$1,290,000 to $1,400,000

Low Bid:
Bids Received: 3
Apparent Low BidHolocene Drilling$ 1,349,902.64
2ndAnderson Environmental$ 1,387,230.66
3rdHolt Services Inc.$ 1,466,738.03

Advertisement for Bids
Plans
Specs
Bothell Crossroads Project Phase 3 Plans
Engineering Design Report
PDI LOGS
Soil Boring Logs
System Layout Details
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Bothell
City Hall
18415 101st Ave NE
Bothell, WA 98011
425-806-6100

Contact: Scott Adamek
scott.adamek@bothellwa.gov

Issued by:
www.bxwa.com

Description:
The Riverside HVOC Site In Situ Groundwater Treatment proposes to apply treatment components to achieve compliance with the groundwater cleanup standards outlined in the Model Toxics Control Act. The general aspects of this work will involve application of in situ groundwater treatment components via direct push injection, and monitoring well installation and decommissioning.