Project #E1578          Bid Date: 3/19/2025 @ 2:00 pm PDT

Phase 2 of Water Line Improvement Project 2025, City of Goldendale, WA

$1,336,915

Plans
Specs
Addendum #1
Addendum #1 Plan
Addendum #2
Bid Results

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Goldendale
City Hall
1103 S Columbus
Goldendale, WA 98620

Issued by:
www.bxwa.com

Engineer:
Pioneer Surveying and Engineering Inc.
125 Simcoe Drive
Goldendale, WA 98620

Contact: Dustin Conroy
509-773-4945

Prebid: 3/11 @ 2:00 pm at City Hall, 1103 S. Columbus, Goldendale, WA

Description:
The project includes the following approximate major work descriptions, bid in separate schedules. 5 schedules of work, 2 base bids and 3 additive items all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.

Base bid Schedule 1: Water Main Improvements on NE High St, Mill St, and Columbus Ave.
Installation of 8-inch and 10-inch water main, services, fire hydrant, valves, bridge crossing and other related work on the following Streets NE High St., Mill St, Columbus Ave. as detailed in the plans Some material for this work will be provided by the City. See the inventory of materials provided by the City located in the proposal documents.

Additive Item 1 Option A: Columbus Ave 4-inch HDPE Pull Through
Installation of 3,931 LF of 4-inch HDPE along Columbus Ave by pulling through the existing 6-inch steel water main. HDPE pipes will be provided by the City. Contractor required to provide other incidental items for proper installation including but not limited to tracer wire, detection tape, pipe bedding and backfill.

Additive Item 1 Option B: Columbus Ave 4-inch HDPE Trench in
Installation of 3,931 LF of 4-inch HDPE along Columbus Ave by trenching and removing the existing 6-inch steel water main. HDPE pipes will be provided by the City. Contractor required to provide other incidental items for proper installation including but not limited to tracer wire, detection tape, pipe bedding and backfill.

Base bid Schedule 2: Water Main Improvements on Allyn St, E Allyn St., Bennet Dr, 12 St Ct.
Installation of 8-inch water main, services, fire hydrant, valves, appurtenances, and other related work on the following Streets Allyn St, E Allyn St., Bennet Dr, 12th St Ct. as detailed in the Plans. Contractor provides all materials for work on these streets.

Additive Item 2: Water Main Improvements on Court St, Washington St., and Highschool
Installation of 8-inch water main, services, fire hydrant, valves, appurtenances, and other related work on the following Streets and locations Court St, Washington St., and along the front of Goldendale High School as detailed in the Plans. Contractor provides all materials for work on these streets.

The City of Goldendale will award either Option A or B of Additive Item 1. Whichever option is most advantageous for the City will be awarded. All bid schedules and Additive Items must be completed for the bid to be considered complete. The City reserves the right to award combined or separate bid schedules deemed most advantageous to the City