2025 West Darland Street Reconstruction Project, City of Goldendale, WA
$896,903.23
Low Bid:
Bids Received: 4 | ||
Apparent Low Bid | Crestline Const. | $ 857,979.93 |
2nd | Ajax NW | $ 982,235.75 |
3rd | James Dean Const. | $ 1,012,275.50 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Goldendale
City Hall
1103 S Columbus
Goldendale, WA 98620
Issued by:
www.bxwa.com
Engineer:
Pioneer Surveying and Engineering Inc.
125 Simcoe Drive
Goldendale, WA 98620
Contact: Dustin Conroy
509-773-4945
Prebid: 5/14 @ 2:00 pm at City Hall, 1103 S Columbus, Goldendale WA
Description:
This Contract provides for 2 schedules of work, bid Schedule 1 and bid Schedule 2, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bid Schedule 1
Installation of approximately 1,050 ton of HMA, 738 ton of crushed surfacing top course, 3690 ton of crushed surfacing base course, 6,602 SY of asphalt milling, 2,850 CY of excavation and embankment, installation of 3,566 LF of standard curb and gutter, 901 LF of rolled curb and gutter, 475 SY of concrete sidewalk, 3 ADA concrete curb ramps, 1,023 LF of 18-inch storm water pipe and other related items of work.
Bid Schedule 2
Installation of 1 sanitary sewer manhole, 65 LF of 12-inch sewer pipe, 1 connecting to existing manhole, 2 decommission existing sanitary sewer line, camera existing sanitary sewer line and other related items of work.