2025 Water Main Replacements Phase 2, City of Bellevue, WA #25084
$5,540,000 to $6,410,000
Low Bid:
| Bids Received: 10 | ||
| Apparent Low Bid | Fury Site Works | $ 4,562,450.35 |
| 2nd | Kar-Vel Construction | $ 4,954,912.02 |
| 3rd | Earthwork Solutions, LLC | $ 4,965,369.64 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Bellevue
Contracting Services Division
450 - 110th Avenue NE
Bellevue, WA 98004
425-452-4870
bellevuewa.gov
Contact:
Jim Stockwell, Project Engineer
425-452-4868
jstockwell@bellevuewa.gov
Issued by:
www.bxwa.com
Notes:
Bid Opening Information:
https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NDY4NDEwM2EtNDQ4Ny00YTVjLWEwMTctYTgxMTk0ZGMzYTJh%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522222d2edd-8255-45bd-8597-52141b82f713%2522%252c%2522Oid%2522%253a%25227b035fa2-2cbf-4d3e-a0f0-44587c915e55%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=47080be8-066a-47e0-80ab-759b49af6c88&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true
Meeting ID: 253 752 802 122 6
Passcode: LE6aF3Hy
Dial in by phone
+1 206-452-7011,,106124934# United States, Seattle
Phone conference ID: 106 124 934#
Description:
Work contemplated to be performed under this contract is as follows:
- Construct approximately 8,160 LF of ductile iron water mains and appurtenances
- Install two (2) PRV Vault and Appurtenances
- Install new fire hydrant assemblies,
- Install replacement water services,
- Relocate existing utilities (as required),
- Abandon asbestos cement pipe,
- Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks,
- Perform Traffic control,
- Other work as required to complete the project.