Cedar Terrace Pump Station Rehabilitation, City of Bellevue, WA #26035
$1,700,000 to $1,900,000
Low Bid:
| Bids Received: 3 | ||
| Apparent Low Bid | Northwest Cascade, Inc. | $ 2,202,686.61 |
| 2nd | Laser Underground & Earthworks, Inc. | $ 2,599,511.80 |
| 3rd | CA Carey Corporation | $ 2,937,483.13 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Bellevue
Contracting Services Division
450 - 110th Avenue NE
Bellevue, WA 98004
425-452-4870
bellevuewa.gov
Issued by:
www.bxwa.com
Notes:
Mandatory Pre-Bid Meeting: 3/20 or 3/25 @ 10:00 am
See specs for details.
Bid Opening Information:
Join: https://teams.microsoft.com/meet/26738054055854?p=YFyf3S8qY3RuecGZen
Meeting ID: 267 380 540 558 54
Passcode: pE6Vc7ox
Dial in by phone
+1 206-452-7011,,903319123# United States, Seattle
Phone conference ID: 903 319 123#
Description:
Work contemplated to be performed under this contract is as includes:
- Demolition of existing wastewater pump station and ancillary equipment and repurposing an existing wet well to a new manhole at the Cedar Terrace Apartments.
- Constructing approximately 415 linear feet of 8-inch diameter D3034 PVC diameter pipe and three manholes on the Cedar Terrace Apartments property using typical cut-and-cover trenching.
- Restoring surface conditions, including grading and stabilizing of a new access road over the installed pipe on the Cedar Terrace Apartments property and asphalt pavement trench patching at Belkirk 520 and Evergreen Business Park .
- Trenchless installation of approximately 250 linear feet of 8-inch diameter HDPE pipe with a minimum 14-inch diameter steel casing between the Cedar Terrace Apartments property and the Belkirk 520 property by horizontal directional drilling.
- Installation of approximately 200 linear feet of 8-inch diameter PVC pipe and two manholes on the Belkirk 520 and Evergreen Business Park properties using typical cutand- cover trenching.
- Installation, monitoring, and removal of settlement monitoring elements.
- Sanitary sewer bypass.
- Dewatering.
- Restoring surface conditions, including asphalt trench patching.
- Tree removal and clearing.
- Landscaping and site restoration.
- Traffic control, as required for Contractor’s construction access.
- Other work as required to complete the project.