Water Main Replacement 2026 Phase 2 & PRV (Includes Replacement of PRV Station #137), City of Bellevue, WA #26022
$7,000,000 to $7,500,000
Plans
Specs
Questions & Answers #1
Addendum #1
Addendum #2
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Bellevue
Contracting Services Division
450 - 110th Avenue NE
Bellevue, WA 98004
425-452-4870
bellevuewa.gov
Contact:
Ali Sabeeh, PMP, ENV SP
425-452-7663
Asabeeh@bellevuewa.gov
Issued by:
www.bxwa.com
Notes:
Bid Opening Information:
Join: https://teams.microsoft.com/meet/25858379291167?p=eNj8brXUq7D0GwnxgX
Meeting ID: 258 583 792 911 67
Passcode: bC6ic6Qe
Dial in by phone
+1 206-452-7011,,872108880# United States, Seattle
Phone conference ID: 872 108 880#
Description:
Work contemplated to be performed under this contract is as follows:
• Constructing approximately 10,100 LF of ductile iron water mains,
• Installing new fire hydrant assemblies,
• Installing replacement water services,
• Constructing a replacement Pressure Reducing Valve in a concrete vault,
• Abandoning existing Pressure Reducing Valve station,
• Construction dewatering,
• Relocating existing utilities (as required),
• Abandoning asbestos cement pipe,
• Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters and sidewalks,
• Performing traffic control,
• Other work as required to complete the project.