City Hall 3rd Floor HR-Fire - Partial Ceiling Renovation, City of Bellevue, WA #25008
$270,000 to $290,000
Advertisement for Bids
Specs & Plans
Site Visit Attendance Sheet
Addendum #1
Bid Results
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Bellevue
Contracting Services Division
450 - 110th Avenue NE
Bellevue, WA 98004
425-452-4870
bellevuewa.gov
Issued by:
www.bxwa.com
Prebid: 4/15 or 4/29 @ 10:00 am or 12:00 pm on site
Notes:
Bid Opening Information:
Meeting ID: 239 298 206 471
Passcode: JR2He6DN
Or call in (audio only)
+1 206-452-7011,,835357393# United States, Seattle
Phone Conference ID: 835 357 393#
Description:
This project includes but is not limited to: (Estimated maximum total duration is 16 weeks from notice to proceed to end of closeout and 100% finalized scope of work for final users mobilization), 3rd-floor enclosed offices ceiling removal and replacement, open work areas ceiling tile replacement, trade permitting as required, coordination and adjustment of MEPs and LV as required, plenum acoustic material installation, coordination with all existing systems (MEP, LV, sound masking, ETC.), patching and wall paint, office equipment protection, cleaning, and other miscellaneous work for a complete an a 100% working systems and scope of work. Any required coordination to prioritize finishing the Fire offices area first to mobilize Fire personnel back to work as soon as possible. All labor, equipment, materials, safety, protection, transportation, hauling, direct and indirect costs, prevailing wages, and compliance with all AHJ requirements, codes, and regulations.