Project #EV51          Bid Date: 4/1/2025 @ 2:00 pm PDT

Beverly Lake Sewer Replacement & Lift Station #47, City of Everett, WA #UP3529

$3,254,847

Low Bid:
Bids Received: 5
Apparent Low BidFaber Construction$ 2,485,193.98
2ndSRV Construction$ 2,497,130.77
3rdColacurcio Brothers$ 2,856,092.19

Plans
Specs
Specs - Appendix B Standard Drawings
Addendum #1
Addendum #1 Plans
Addendum #2
Bid Results
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Contact:
Daniel T. Enrico, PE, Project Manager
denrico@everettwa.gov

Issued by:
www.bxwa.com

Prebid: 3/18 @ 10:00 am and 3/25 @ 1:00 pm at 3200 Cedar St, Everett WA 98201

Notes:
Appendix B Standard Drawings Link
https://www.everettwa.gov/DocumentCenter/View/7039/Vol-2--Drawings-?bidId=

Description:
Work to include installation of a new lift station including the vaults, wet well, foundation, roofing, piping, painting, pumps, buried structures, motors, electrical, instrumentation, communication, force main, new electrical service, water service and miscellaneous accessories; abandoning existing sewer facilities; modifications to and installation of new yard piping; restoration of site grading/work, brush removal and trimming; and the installation of fencing, asphalt, concrete paving and other such appurtenances and performing all Work as required by the Contract Documents.