Project #EV54          Bid Date: 5/13/2025 @ 2:00 pm PDT

2025 Federal Overlay, West Mukilteo Blvd - Glenwood Avenue to Dogwood Drive, City of Everett, WA #3842

$927,686

Plans
Specs

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Contact:
Gina Loring, Project Manager
gloring@everettwa.gov

Issued by:
www.bxwa.com

Description:
The project includes, is not limited to, the construction of up to 2,794 tons of Hot Mix Asphalt, Class ½- inch, PG 64-22, two inches (2") thick, on selected City streets, including grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case and cover, striping, channelization, traffic induction loops, and performing all other work as required by the contract.