Port Gardner Storage Facility - Facility Construction Package, City of Everett, WA #UP-3525 - Addendum #4

Order Prints   FastBid Help

This document has 627 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Addendum #4
Page 29 Section 019100 Exhibit A - Site CS Operational Modes
Page 49 Section 333212.02 Self Priming Centrifugal Packaged Wastewater Pump Stations
Page 63 Section 400507.14 Exhibit A - Settlement / Seismic Joint Locations
Page 67 Section 406193A Process Control System Input / Output List
Page 80 Section 406196.01 Process Control Description Site
Page 91 Table of Contents
Page 99 Standard Details
Page 106 Geotechnical Engineering Report
Page 618 Pre-Bid Meeting Handouts
Page 626 Woody Debris Exhibit