Page 1 Cover Page
Page 2 Table of Contents
Page 3 Attachment A Scott Paper Company & Kimberly-Clark As-Built Drawings
Page 86 Attachment B May 2025 Geotechnical Report
Page 599 Attachment C HWA Geosciences Inc. Concrete Coring & Lab Testing for Structural Evaluation
Page 707 Attachment D Corrosion Probe, Inc. October / November 2022 Condition Assessment
Page 784 Attachment E Floyd Snider Utility Property Cleanup Action Plan Memorandum
Page 816 Attachment F Regulated Building Materials Assessments: Terracon Consultants, Inc. & Lift Station Asbestos / Lead Survey
Page 931 Attachment G City of Everett Solid Waste Facility Permit # PT0005247 (SW-393)
Page 937 Attachment H Prevailing Wage Forms
Page 938 Washington State Prevailing Wage Rates - Snohomish County
Page 984 Benefit Code Key
Page 1002 Attachment I Temporary Electrical System
Page 1034 Attachment J 1000 KVA Diesel Engine Driven Generator Set - Manufacturer's Information & Requirements
Page 1145 Attachment K Draft Stormwater Pollution Prevention Plan (SWPPP)
Page 1382 Attachment L Archeological Monitoring & Inadvertent Discovery Plan
Page 1434 Attachment M 2019 Boundary Line Adjustment of Former Kimberly-Clark Worldwide, Inc.
Page 1440 Attachment N Alternative Staging Areas