Everett Station - HVAC and Controls Improvements, City of Everett, WA #24-3201
$1,400,000
Low Bid:
| Bids Received: 4 | ||
| Apparent Low Bid | Apex Mechanical LLC | $ 1,938,636.00 |
| 2nd | DK Systems | $ 2,213,523.38 |
| 3rd | Copper Mechanical LLC | $ 2,488,136.00 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Everett
2930 Wetmore
Everett, WA 98201
Issued by:
www.bxwa.com
Prebid: Mandatory: 11/18, 11/20, or 12/9 @ 10:00 am onsite, Everett Station, 3201 Smith Avenue, Everett, WA 98201
Description:
Work being performed includes, but not limited to the replacement of the DDC building controller, VAV controllers, thermostats, and connecting infrastructure. Also includes replacement of the Three (3) existing rooftop McQuay VAV air handlers. Includes replacement of hydronic control valves at the air handlers and re-balancing of the air and hydronic systems.