Port Gardner Storage Facility - West Marine View Drive Storm & Combined Sewer Design - Construction Package 2, City of Everett, WA #UP-3815-02
$60,593,717
Low Bid:
| Bids Received: 5 | ||
| Apparent Low Bid | KLB Construction, LLC | $ 43,694,570.62 |
| 2nd | Shimmick Construction Company, Inc | $ 56,824,464.29 |
| 3rd | James W Fowler, Co | $ 57,660,112.02 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Everett
2930 Wetmore
Everett, WA 98201
Issued by:
www.bxwa.com
Prebid: Mandatory: 1/20 @ 10:00 am or 1/22 @ 2:00 pm or 2/3 @ 2:00 pm, directly east of the PGSF Site, at 2200 W Marine View Drive, Everett, WA 98201
Notes:
The searchable PDF files of the Project plans and specifications may be accessed using the following link, which will expire on 2/27/26 at 2:00pm:
https://ftp.everettwa.gov/?ShareToken=5779C93F4E9BEFD266EA3D9CF723997ECDECED24
Description:
The project “Port Gardner Storage Facility West Marine View Drive Storm and Combined Sewer – Construction Package 2” consists of construction of various diameter pipelines and structures to convey wastewater and stormwater to the Port Gardner Storage Facility (PGSF) from multiple locations north and south of PGSF. The PGSF will provide temporary combined sewer storage, reducing CSOs at the City’s four remaining uncontrolled CSO discharge points to meet the Washington State Department of Ecology executed Agreed Order number 11638.This facility will also provide stormwater treatment for separated stormwater drainage basins with conveyance to the City’s deepwater outfall and local stormwater conveyance to the Everett Water Pollution Control Facility. This facility is scheduled to be operational by December 31, 2027.