Project #EV66          Bid Date: 2/17/2026 @ 2:00 pm PST

Lowell Riverfront Trail Improvements, City of Everett, WA #WO 409725

$1,065,000

Low Bid:
Bids Received: 8
Apparent Low BidOMA Construction, Inc.$ 1,035,258.00
2ndWyser Construction Co., Inc.$ 1,206,537.15
3rdExcavation West, Inc.$ 1,225,615.04

Plans
Specs
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plan
Bid Results

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Everett
2930 Wetmore
Everett, WA 98201

Contact:
Katherine Phillips
kphillips@everettwa.gov

Issued by:
www.bxwa.com

Prebid: Mandatory: 2/3 @ 10:00 am on site, 2901 Lowell Snohomish River Road, Everett, WA 98201

Description:
The City of Everett intends to remove a portion of the Lowell Riverfront trail along the left bank of Snohomish River relocating trail to west. The relocated trail will include an elevated deck structure through a wetland. A portion of the trail along the northern edge of the parcel will be removed and replaced with grass pavers to maintain access for utility maintenance. The work includes restoration planting along the river bank.