Newport Sewer Relocation, City of Issaquah, WA #SW017 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 300 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Contract Documents & Specifications
Page 4 Table of Contents
Page 5 Advertisement for Bids
Page 7 Instructions to Bidders
Page 8 Bidder's Checklist
Page 10 Proposal
Page 11 Bid Proposal
Page 15 Proposal Signature Sheet
Page 16 Certificate as to Corporate Principal
Page 17 Statement of Bidder's Qualifications
Page 20 Contractor Certification / Wage Law Compliance - Responsibility Criteria
Page 21 Deposit for Bid Bond Form - Deposit Statement
Page 22 Subcontractor List
Page 23 Non-Collusion & Debarment Declaration
Page 24 Public Works Contract
Page 26 Public Works Performance Bond
Page 27 Public Works Payment Bond
Page 28 Special Provisions
Page 30 Introduction to the Special Provisions
Page 31 Division 1 General Requirements
Page 95 Division 2 Earthwork
Page 99 Division 4 Bases
Page 103 Division 5 Surface Treatments & Pavements
Page 130 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 160 Division 8 Miscellaneous
Page 164 Division 9 Materials
Page 165 Appendices
Page 166 Appendix A State Prevailing Wage Rates - King County
Page 167 Washington State Prevailing Wage Rates - King County
Page 227 Benefit Code Key
Page 245 Appendix B Standard Plans (Issaquah & WSDOT)
Page 264 Appendix C City of Issaquah Sewer Testing & Inspection Requirements
Page 271 Appendix D Geotechnical Report Data
Page 298 Appendix E Permit
Page 299 Appendix F Existing Gas Line Relocation - by Puget Sound Energy