Storm Drainage Rehabilitation and Improvement Program, City of Issaquah, WA #ST008
$215,000 to $260,000
Plans - Revised
Specs - Revised
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Issaquah
130 E Sunset Way
PO Box 1307
Issaquah, WA 98027
Contact: Tiffany Tillison
425-754-3473
tiffany.tillison@issaquahwa.gov
Issued by:
www.bxwa.com
Notes:
Project Estimate:
Base Bid Range: $215,000.00 - $260,000.00
Additive A1 Range: $375,000.00 - $415,000.00
Bid Opening Information:
call in number 206-485-0299
meeting access code: 440893167#
Description:
The Work to be performed under this contract includes the replacement and installation of approximately 325 linear feet of stormwater pipes including catch basins along Wildwood Boulevard SW. Work includes roadway excavation, asphalt pavement patching, curb and gutter replacement, landscaping, and other work related to stormwater in the City of Issaquah. Additive A1 site at 485 Wildwood Blvd SW includes installation of 60 linear feet of stormwater pipes, approximately 475 linear feet of cured-in-place pipe (CIPP) lining, and driveway restoration. Determination of low bidder will be based on the total bid amount of both Schedule A: Base Bid and Schedule A1: Additive 1 485 Wildwood Blvd SW. In the event that the City elects not to proceed with Schedule A1: Additive 1 485 Wildwood Blvd SW based on the total of the bids, the City reserves the right to award only the work under Schedule A: Base Bid and to make a determination of low bidder for only the Schedule A: Base Bid.