Page 1 Cover Page
Page 2 Table of Contents
Page 4 Part 1 - Project and Bidding Information
Page 5 Call for Bids
Page 6 Information for Bidders
Page 8 Bidder's Checklist
Page 9 Part 2 - Bid Proposal Documents
Page 10 Statement of Bidder's Qualifications
Page 12 List of Subcontractors
Page 14 Bid Proposal Form
Page 16 Bid Schedule
Page 18 Proof of Authority to Sign Bid
Page 20 Bid Deposit
Page 21 Deposit or Bid Bond Form
Page 22 Certification of Compliance with Wage Payment Statutes
Page 23 Part 3 - Contract Documents
Page 24 Public Works Contract
Page 28 Performance Bond
Page 29 Payment Bond
Page 30 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 31 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 32 Retainage Escrow Agreement and Instructions
Page 37 Retainage Bond
Page 39 Part 4 - Prevailing Wage Rates
Page 40 Part 5 - Special Provisions
Page 41 Introduction to the Special Provisions
Page 42 Technical Specifications
Page 43 Table of Contents - Technical Specifications
Page 48 Division 1 General
Page 70 Division 2 Sitework
Page 83 Division 3 Concrete
Page 95 Division 4 Masonry (Not Used)
Page 96 Division 5 Metals (Not Used)
Page 97 Division 6 Wood, Plastics, and Composites (Not Used)
Page 98 Division 7 Thermal and Moisture Protection (Not Used)
Page 99 Division 8 Openings (Not Used)
Page 100 Division 9 Finishes (Not Used)
Page 101 Division 10 Specialties (Not Used)
Page 102 Division 11 Equipment (Not Used)
Page 103 Division 12 Furnishings (Not Used)
Page 104 Division 13 Special Construction
Page 106 Division 14 Conveying Systems (Not Used)
Page 107 Division 15 Mechanical
Page 125 Division 16 Electrical
Page 132 Division 17 Automatic Control (Not Used)
Page 133 Division 18 Measurement and Payment
Page 136 Construction Plans (Under Separate Cover)
Page 137 Standard Plans (Under Separate Cover)
Page 138 Appendix A Anticipated Submittal List