2024 Pavement Preservation Project, City of Marysville, WA #11430090.548 TB106 -    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 165 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 4 Part 1 Project & Bidding Information
Page 5 Call for Bids
Page 6 Information for Bidders
Page 8 Bidder's Checklist
Page 9 Part 2 Bid Proposal Documents
Page 10 Statement of Bidder's Qualifications
Page 12 List of Subcontractors
Page 14 Bid Proposal Form
Page 24 Bid Deposit
Page 25 Deposit or Bid Bond Form - Deposit Statement
Page 26 Certification of Compliance with Wage Payment Statutes
Page 27 Part 3 Contract Documents
Page 28 Public Works Contract
Page 32 Performance Bond
Page 33 Payment Bond
Page 34 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 35 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 36 Retainage Escrow Agreement & Instructions
Page 41 Retainage Bond
Page 43 Part 4 Prevailing Wage Rates
Page 44 Part 5 Special Provisions
Page 45 Introduction to the Special Provisions
Page 46 Division 1 General Requirements
Page 84 Division 2 Earthwork
Page 89 Division 5 Surface Treatments & Pavements
Page 116 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 120 Division 8 Miscellaneous Construction
Page 125 Division 9 Materials
Page 129 Construction Plans (Under Separate Cover)
Page 130 Standard Plans
Page 164 Manual on Uniform Traffic Control Devices