Lift Station Controls Upgrade, City of Port Orchard, WA #PW2025-014
$588,736 to $990,962
Plans
Specs
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
City of Port Orchard
216 Prospect Street
Port Orchard, WA 98366
publicworks@portorchardwa.gov
Issued by:
www.bxwa.com
Description:
The project consists of work to be performed within 342 working days from notice to proceed, and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: The City of Port Orchard desires to make electrical and controls improvements to six existing sewer lift stations. Each station’s motor starters and control panel will be replaced with an improved remote telemetry unit (RTU) consisting of a standardized programmable logic controller (PLC), soft starters sized to existing pumps, and radio. Each station’s instrumentation is replaced and improved with analog level sensors. Each station’s electrical improvements consist of standardizing portable generator connections. Eagle Crest Lift Station improvements include a prepurchased generator and transfer switch installation.