This document has 468 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.
Page 1 Cover Page
Page 3 Citation
Page 5 Certification
Page 7 Table of Contents
Page 9 Legal Documents
Page 11 Call for Bids
Page 13 Bidder's Checklist
Page 15 Information and Checklist for Bidders
Page 19 Proposal - Signature Page
Page 21 Proposal
Page 23 Schedules A Through D
Page 33 Certification of Receipt of Addendums
Page 35 Bidder's Qualification Form
Page 37 Local Agency Subcontractor List
Page 39 Local Agency Proposal Bond
Page 41 Certificate as to Corporate Principal
Page 43 Certificate as to Corporate Seal
Page 45 Certification of Compliance with Wage Payment Statutes
Page 47 Non-Collusion Declaration
Page 49 Local Agency Certification for Federal-Aid Contracts
Page 51 Disadvantaged Business Enterprise Utilization Certification
Page 53 Disadvantaged Business Enterprise Utilization Certification (Example)
Page 55 Disadvantaged Business Enterprise (DBE) Written Confirmation Document
Page 57 Disadvantaged Business Enterprise (DBE) Bid Item Breakdown Form
Page 59 Bidder Questionnaire
Page 61 Disadvantaged Business Enterprise (DBE) Trucking Credit Form
Page 63 Contractor Certification / Wage Law Compliance - Responsibility Criteria
Page 65 Contract
Page 67 Public Works Performance Bond
Page 69 Public Works Payment Bond
Page 71 Certificate of Liability Insurance
Page 73 Statement of Intent to Pay Prevailing Wages
Page 75 Statement of Intent to Pay Prevailing Wages - Sample
Page 77 Affidavit of Wages Paid
Page 79 Request for Release
Page 81 Certification of Materials Origin
Page 83 Request to Sublet Work
Page 85 Certification for Federal-Aid Projects
Page 87 Request for Approval of Material
Page 89 Required Contract Provisions Federal-Aid Construction Contracts (FHWA 1273)
Page 105 Special Provisions
Page 107 Introduction to the Special Provisions
Page 109 Division 1 General Requirements
Page 199 Division 2 Earthwork
Page 213 Division 3 Aggregate Production and Acceptance
Page 215 Division 4 Bases
Page 217 Division 5 Surface Treatments and Pavements
Page 249 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits
Page 267 Division 8 Miscellaneous Construction
Page 293 Division 9 Materials
Page 301 Appendix A Final Geotechnical Engineering Report
Page 371 Appendix B Prevailing Wage Rates
Page 373 Federal Wage Rates
Page 423 State of Washington Prevailing Wage Rates - Kitsap County
Page 424 Supplemental to Wage Rates
Page 435 Benefit Code Key
Page 453 Appendix C WSDOT Standard Plans
Page 465 Appendix D Construction Stormwater General Permit Coverage Letter