Interstate 5 Port of Tacoma Road Interchange - Phase 2A, City of Fife, WA - Addendum #1 Volume 2 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 2592 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Part 2 Contract Specifications
Page 3 Table of Contents
Page 6 Introduction to the Special Provisions
Page 7 Division 1 General Requirements
Page 115 Division 2 Earthwork
Page 139 Division 5 Surface Treatments & Pavements
Page 145 Division 6 Structures
Page 166 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 182 Division 8 Miscellaneous Construction
Page 294 Division 9 Materials
Page 346 Part 3 Appendices
Page 347 Appendix A Geotechnical Engineering Services Final Report
Page 743 Appendix B Permits
Page 770 Appendix C Existing Port of Tacoma Road Bridge Plans
Page 797 Appendix D Utility Standards
Page 960 Appendix E Estimate of Remedial Mass Recovery Technical Memo Regarding Contaminated Soils
Page 987 Appendix F Standard Plans
Page 1154 Appendix G Potholing Information
Page 1243 Appendix H SWPPP Narrative
Page 1377 Appendix I Hydraulic (Drainage) Report
Page 2379 Appendix J Utility Relocation Plans
Page 2389 Appendix K Existing Wall Plans
Page 2432 Appendix L Soil Sampling Letter Report
Page 2527 Appendix M Department of Ecology Letter
Page 2546 Appendix N Public Interest Finding (PIF)
Page 2559 Appendix O Good Faith Survey
Page 2588 Appendix P Landscape Maintenance Bond