80th Sidewalk and Overlay, City of Stanwood, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 121 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Certificate of Engineer
Page 5 Advertisement for Bids
Page 6 Part 1 Bidding Requirements
Page 7 Instructions to Bidders
Page 9 Bidder's Checklist
Page 10 Bidder's Construction Experience
Page 12 Bid Proposal
Page 15 Subcontractor List
Page 16 Addenda Received
Page 17 Non-Collusion Affidavit
Page 18 Certification of Compliance with Wage Payment Statutes Form
Page 19 Bid Security Transmittal Form
Page 20 Title VI
Page 21 Part 2 Contract Documents
Page 22 Public Works Contract
Page 32 Part 3 Special Provisions
Page 33 Introduction to the Special Provisions
Page 34 Division 1 General Requirements
Page 80 Division 2 Earthwork
Page 86 Division 4 Bases
Page 88 Division 5 Surface Treatments & Pavements
Page 112 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 113 Division 8 Miscellaneous Construction
Page 120 IV - Washington State Prevailing Wage Rates for Snohomish County
Page 121 Prevailing Wages