Martha Lake Airport Park & Paine Field Park Playground Replacements, Snohomish County, WA #PW-26-0725SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 964 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 5 Instructions to Bidders
Page 12 Prevailing Wage Rates
Page 14 General Conditions
Page 26 Supplementary Conditions
Page 27 Bid Proposal
Page 28 Bidder's Checklist
Page 29 Bid Proposal Form
Page 32 Certification of Compliance with Wage Payment Statutes
Page 33 Bid Deposit / Bid Bond
Page 34 Statement of Bidder's Qualifications
Page 36 Contract Documents (Sample)
Page 37 Contract Documents Checklist
Page 38 Agreement
Page 41 Exhibit A Insurance Requirements
Page 43 Performance, Payment & Warranty Bond
Page 45 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 46 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 47 Escrow Agreement Instructions
Page 48 Escrow Agreement
Page 50 Retainage Bond
Page 52 Project Manual
Page 53 Section 000107 Seals Page
Page 54 Section 000110 Table of Contents
Page 56 Section 011100 Summary of Work
Page 62 Section 012500 Substitution Procedures
Page 66 Section 012600 Contract Modification Procedures
Page 71 Section 012900 Payment Procedures
Page 75 Section 013100 Project Management & Coordination
Page 79 Section 013300 Submittal Procedures
Page 87 Section 014000 Quality Requirements
Page 95 Section 014200 References
Page 99 Section 015000 Temporary Facilities & Controls
Page 106 Section 015639 Temporary Tree & Plant Protection
Page 116 Section 015713 Temporary Erosion & Sediment Control
Page 130 Section 015719 Temporary Environmental Controls
Page 138 Section 017400 Cleaning & Waste Management
Page 145 Section 017600 Protecting Installed Construction
Page 150 Section 017700 Closeout Procedures
Page 154 Substantial Completion
Page 155 Final Acceptance
Page 156 Section 017800 Closeout Submittals
Page 160 Section 017836 Warranties & Bonds
Page 163 Section 017839 Record Documents
Page 167 Section 017900 Demonstration & Training
Page 169 Section 024113 Selective Site Demolition
Page 174 Section 031000 Concrete Forming
Page 178 Section 032000 Concrete Reinforcing
Page 181 Section 033000 Cast-In-Place Concrete
Page 188 Section 116813 Playground Equipment
Page 194 Section 321313 Concrete Paving
Page 201 Section 321816.13 Playground Protective Surfacing
Page 206 Section 323300 Site Furnishings
Page 211 Section 329400 Planting Accessories
Page 214 Appendix A Martha Lake Airport - Playground Equipment Manufacturer's Installation Instructions
Page 634 Appendix B Martha Lake Airport - 2007 Playground As-Built Drawings
Page 636 Appendix C Paine Field - Playground Equipment Manufacturer's Installation Instructions