Taxilane E Reconstruction Project Phase 2, Snohomish County, WA #PW-24-0361SB - Volume 1 Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 375 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 4 Table of Contents
Page 7 Division I General Requirements
Page 8 Part I Bidding Requirements and Documents
Page 9 Part IA Bidding Requirements
Page 10 Public Work Invitation to Bid
Page 11 Notice of Call for Bids
Page 14 Instructions to Bidders
Page 21 Prevailing Wage Rates
Page 23 Part IB General Conditions for Construction
Page 48 Exhibit A Monthly Apprentice Utilization Report Form
Page 49 Part IC Bidding Documents to be Submitted with Bid
Page 50 Bid Proposal
Page 51 Bidder's Checklist
Page 52 Snohomish County Bid Proposal Form
Page 57 Certification of Compliance with Wage Payment Statutes
Page 58 Debarment, Suspension, Ineligibility or Voluntary Exclusion Certification Form
Page 60 Bid Deposit / Bid Bond
Page 61 Statement of Bidder's Qualifications
Page 63 Certification of Compliance with FAA Buy American Preference - Construction Projects
Page 65 Certification of Lower Tier Contractors Regarding Debarment
Page 66 Certification Regarding Lobbying
Page 67 Certification of Non-Segregated Facilities
Page 68 Trade Restriction Certification
Page 69 Certification of Eligibility
Page 70 Bidder's Statement on Previous Contracts Subject to EEO Clause
Page 71 Certification of Offeror / Bidder Regarding Tax Delinquency and Felony Convictions
Page 72 Letter of Intent
Page 73 Bidders List
Page 74 Snohomish County Subcontractor List - HVAC, Plumbing & Electrical
Page 75 Snohomish County Subcontractor List - Structural Steel & Rebar Installation
Page 76 Part II Contract Documents
Page 77 Sample Contract Documents
Page 78 Contract Documents Checklist
Page 79 Agreement
Page 82 Exhibit A Insurance Requirements
Page 84 Performance, Payment & Warranty Bond
Page 86 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 87 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 88 Snohomish County Escrow Agreement Instructions
Page 89 Escrow Agreement
Page 91 Retainage Bond
Page 94 Part III FAA Special Provisions
Page 127 Division II FAA General Provisions
Page 182 Division III Technical Specifications
Page 183 Item A-101 FOD Prevention
Page 186 Item C-100 Contractor Quality Control Program (CQCP)
Page 194 Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control
Page 201 Item C-105 Mobilization
Page 203 Item C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL)
Page 209 Item P-101 Demolition, Removal, and Abandonment
Page 215 Item P-152 Excavation, Subgrade, and Embankment
Page 223 Item P-153 Controlled Low-Strength Material (CLSM)
Page 226 Item P-209 Crushed Aggregate Base Course
Page 233 Item P-401 Asphalt Mix Pavement
Page 255 Item P-501 Cement Concrete Pavement
Page 290 Item P-603 Emulsified Asphalt Tack Coat
Page 293 Item P-604 Compression Joint Seals for Concrete Pavements
Page 299 Item P-605 Joint Sealants for Pavements
Page 303 Item P-610 Concrete for Miscellaneous Structures
Page 310 Item P-620 Taxiway Marking
Page 316 Item D-701 Pipe for Storm Drains and Culverts
Page 322 Item D-705 Pipe Underdrains for Airports
Page 328 Item D-751 Manholes, Catch Basins, Inlets, Underdrain Cleanouts, and Inspection Holes
Page 334 Item T-901 Seeding
Page 339 Item T-905 Topsoil
Page 342 Item L-108 Underground Power Cable for Airports
Page 354 Item L-110 Airport Underground Electrical Duct Banks and Conduits
Page 363 Item L-115 Electrical Manholes and Junction Structures
Page 371 Item L-125 Installation of Airport Lighting Systems