Intermodal Rail Yard Track Expansion Phase 1, Snohomish County, WA #RR8758, PW-25-0619SB
$4,440,060.60
Documents:
Notice of Call for Bids
Plans
Specs
Official Proposal to be turned in for bid opening
Addendum #1:
Addendum #1
Addendum #2:
Addendum #2
Addendum #3:
Addendum #3
Addendum #3 Plans
Addendum #4:
Addendum #4
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Snohomish County Public Works
3000 Rockefeller Ave M/S 607
Everett, WA 98201-4067
Contact - Bid Submittal / Questions:
Snohomish County Purchasing Division
Robert J. Drewel Building, 6th Floor
M/S 507
3000 Rockefeller Avenue
Everett, WA 98201-4067
Phone: 425-388-3344
Email: purchasing@snoco.org
Issued by:
www.bxwa.com
Prebid: 3/24 @ 9:00 am, 905 / 915 Riverside Road, Everett, WA
Notes:
Bid Opening Information:
https://bit.ly/SnoCoBids
The phone number to call is 1-425-262-2000
Phone Conference ID is 712 654 577#.
Description:
A. General:
1. The descriptions in this section are not intended to provide or be construed as a complete summary of the Contract Documents. The following only identifies in broad terms the general nature of the Work to be performed by the Contractor and its
Subcontractors.
2. Contractor shall perform and complete all Work in accordance with the requirements set forth in the Contract Documents.
3. This section should be read as if “provide and install” were included at the front of each sentence.
4. Responsibility for the providing and the installation of every element is borne by the Contractor.
B. Site Work:
1. The Work includes the following:
a. Erosion and sediment controls.
b. Addition of rail track spur.
c. Pavement and site improvements, including demolition of existing site features.
d. Offsite disposal of hazardous and dangerous waste.
e. Surface water management practices.
f. Reconfiguring entrance to the Site.
2. Obtain and pay for all permits required for the work, other than those provided by County, including offsite, oversize load transportation permit(s) if applicable, and any bother permits.
3. Temporary facilities including but not limited to temporary utilities, Contractor’s office trailer (if needed), supplies, temporary fencing, signage, traffic management, flagging and other means of protecting the public and operations staff from hazards of the Work including traffic control during delivery and offloading of materials and items in accordance with requirements of Section 01 50 00 – Temporary Facilities and Controls.