Flowing Lake Dock & Waterfront Access, Snohomish County, WA #PW-26-0628SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 434 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Invitation to Bid
Page 2 Notice of Call for Bids
Page 5 Instructions to Bidders
Page 12 Prevailing Wage Rates
Page 14 General Conditions
Page 30 Bid Proposal
Page 31 Bidder's Checklist
Page 32 Bid Proposal Form
Page 36 Certification of Compliance with Wage Payment Statutes
Page 37 Bid Deposit / Bid Bond
Page 38 Statement of Bidder's Qualifications
Page 40 Subcontractor List - HVAC, Plumbing & Electrical
Page 41 Subcontractor List - Structural Steel & Rebar Installation
Page 42 Contract Documents (Sample)
Page 43 Contract Documents Checklist
Page 44 Agreement
Page 47 Exhibit a Insurance Requirements
Page 49 Performance, Payment & Warranty Bond
Page 51 Contractor's Declaration of Option for Management of Statutory Retained Percentage
Page 52 Assignment of Savings or Time Deposit Escrow Retained Percentage Holding Account
Page 53 Escrow Agreement Instructions
Page 54 Escrow Agreement
Page 56 Retainage Bond
Page 58 Project Manual
Page 59 Section 000107 Seals Page
Page 60 Section 000110 Table of Contents
Page 62 Section 011100 Summary of Work
Page 69 Section 012300 Base Bid & Optional Bid Items
Page 71 Section 012500 Substitution Procedures
Page 75 Section 012600 Contract Modification Procedures
Page 80 Section 012900 Payment Procedures
Page 85 Section 013100 Project Management & Coordination
Page 90 Section 013300 Submittal Procedures
Page 97 Section014000 Quality Requirements
Page 105 Section 014126 Permitting Requirements
Page 106 Section 014200 References
Page 110 Section 015000 Temporary Facilities & Control
Page 117 Section 015639 Temporary Tree & Plant Protection
Page 127 Section 015713 Temporary Erosion & Sediment Control
Page 138 Section 015719 Temporary Environmental Controls
Page 146 Section 017400 Cleaning & Waste Management
Page 153 Section 017600 Protecting Installed Construction
Page 157 Section 017700 Closeout Procedures
Page 161 Request for Confirmation of Substation Completion
Page 163 Request for Confirmation of Final Acceptance
Page 164 Section 017800 Closeout Submittals
Page 168 Section 017836 Warranties & Bonds
Page 171 Section 017839 Record Documents
Page 175 Section 024113 Selective Site Demolition
Page 180 Section 031000 Concrete Forming
Page 184 Section 032000 Concrete Reinforcing
Page 187 Section 033000 Cast-In-Place Concrete
Page 195 Section 055000 Sanican Enclosure
Page 202 Section 310000 Earthwork
Page 209 Section 311000 Site Clearing
Page 212 Section 321216 Asphalt Paving
Page 216 Section 321313 Concrete Paving
Page 223 Section 321500 Beach Sand
Page 225 Section 321540 Crushed Stone Paving
Page 229 Section 321700 Paving Specialties
Page 234 Section 323300 Site Furnishings
Page 241 Section 329200 Lawns & Grasses
Page 248 Section 329300 Plants
Page 264 Section 329400 Panting Accessories
Page 268 Appendices / Appendix A Project Permits
Page 278 Appendix B Survey Sheets
Page 293 Appendix C Existing Condition As-Built Drawings
Page 302 Appendix D Snohomish County BMP Illustrated Guide
Page 374 Appendix E Cultural Resources Survey Draft