JTA 480V Service Design Project - Phase 1, Jefferson Transit Authority, Port Townsend, WA
Plans
Specs
Register on this project.
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Jefferson Transit Authority
Customer Service Desk
63 4 Corners Road
Port Townsend, WA 98368
Contact: Jayme Brooke
360-385-3020 x 110
jbrooke@jeffersontransit.com
Issued by:
www.bxwa.com
Description:
The scope of work of this project, Jefferson Transit Authority 480V Service Design – Phase 1, includes coordination with Jefferson Transit Authority (JTA), InductEV, and the Contractor to provide all materials and labor that shown on the drawings and these specifications, but not limited to, the following:
1. Coordinate with InductEV representative and JTA personnel and install the 300kW InductEV Bus Charger. Provide all accessories required for this installation in accordance with the drawings and these specifications.
2. Coordinate with InductEV representative and JTA personnel and install the 2 – 150kW InductEV coils on busses parking stalls. Provide all accessories required for this installation in accordance with the drawings and these specifications.
3. Trenching, backfill, and surface restoration from the existing 1,200A, 480/277V Switchboard to the new 300 kW bus charger.
4. Trenching, backfill, and surface restoration from the new 300 kW bus charger to the (2) 150 kW coils.
5. Notify the City of Port Townsend inspector to inspect trench with conduits before installing any wiring.
6. Provide conduits and wires from the existing 1,200A, 480/277V Switchboard to new 300kW bus charger.
7. Provide conduits from the new 300 kW bus charger to the (2) 150kW coils.
8. Provide any future conduits as required for future loads.