Project #E1436          Bid Date: 1/29/2025 @ 11:00 am PST

171st Ave Water Main Replacement - Phase 3, Three Lakes Water Association, Snohomish County, WA

$708,800

Low Bid:
Bids Received: 8
Apparent Low BidD&G Backhoe, Inc$ 758,043.00
2ndTRICO Companies, LLC$ 799,225.00
3rdB&L Utility, Inc.$ 840,526.20

Plans
Specs
Bid Forms
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Three Lakes Water Association
17503 58th St SE
PO Box 24
Snohomish, WA 98291

Contact: Don Kemmis
425-903-1601
dkemmis@3lwa.org

Issued by:
www.bxwa.com

Engineer:
David Evans and Associates, Inc.
14432 SE Eastgate Way, Suite 400
Bellevue, WA 98007
425-519-6500
Fax: 425-519-5361

Contact: Rodney Langer
425-586-9751
rodney.langer@deainc.com

Description:
Principal items of the project are: Installation of approximately 3,420 lineal feet of 8” ductile iron water main and appurtenances to replace existing 6” asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. The project includes four separate work segments varying in length, divided based on ability to complete work and connections to existing system while minimizing interruptions of service. Work may only be conducted on one segment at a time.