171st Ave Water Main Replacement - Phase 3, Three Lakes Water Association, Snohomish County, WA
$708,800
Low Bid:
Bids Received: 8 | ||
Apparent Low Bid | D&G Backhoe, Inc | $ 758,043.00 |
2nd | TRICO Companies, LLC | $ 799,225.00 |
3rd | B&L Utility, Inc. | $ 840,526.20 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Three Lakes Water Association
17503 58th St SE
PO Box 24
Snohomish, WA 98291
Contact: Don Kemmis
425-903-1601
dkemmis@3lwa.org
Issued by:
www.bxwa.com
Engineer:
David Evans and Associates, Inc.
14432 SE Eastgate Way, Suite 400
Bellevue, WA 98007
425-519-6500
Fax: 425-519-5361
Contact: Rodney Langer
425-586-9751
rodney.langer@deainc.com
Description:
Principal items of the project are: Installation of approximately 3,420 lineal feet of 8” ductile iron water main and appurtenances to replace existing 6” asbestos cement water main, water main connections, fire hydrants, reconnection of existing water services, trench restoration and limited pavement overlay, and site restoration. The project includes four separate work segments varying in length, divided based on ability to complete work and connections to existing system while minimizing interruptions of service. Work may only be conducted on one segment at a time.