Site 525 Well 23 Development, Firgrove Mutal Water Company, Puyallup, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 666 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Certificate Page
Page 5 Table of Contents
Page 11 Call for Bids
Page 13 Instructions to Bidders
Page 15 Bidding & Proposal Forms
Page 17 Bidding & Proposal Forms Checklist
Page 19 Proposal Bond
Page 21 Proposal Schedule of Prices
Page 23 Non-Collusion Declaration
Page 25 Proposal Signature Page
Page 27 Proposed Subcontractor List
Page 29 Statement of Bidder's Qualifications
Page 31 Contract Documents
Page 33 Sample Contract Documents Checklist
Page 35 Contract
Page 41 Performance, Payment & Guaranty Bond
Page 43 Special Provisions
Page 65 Supplemental Specifications Construction Specifications Institute (01) Format
Page 67 Section 01010 Summary of Work
Page 71 Section 01014 Construction Constraints & Sequence
Page 75 Section 01025 Measurement & Payment
Page 87 Section 01300 Project Data Submittals
Page 95 Section 01320 Project Scheduling
Page 101 Section 01410 Testing & Quality Control
Page 103 Section 01500 Construction Facilities & Temporary Controls
Page 109 Section 01620 Protection of Materials & Equipment
Page 111 Section 01640 Installation of Owner-Furnished Equipment
Page 115 Section 01660 Facility Startup & Testing
Page 119 Section 01665 Facility Training
Page 121 Section 01730 Operation & Maintenance Data
Page 125 Section 01780 Closeout Procedures
Page 131 Section 02072 Demolition & Salvaging
Page 135 Section 02150 Excavation Support Systems
Page 137 Section 02210 Earthwork
Page 143 Section 02222 Excavating, Backfilling & Compacting for Utilities
Page 151 Section 02275 Temporary Erosion & Sedimentation Control
Page 157 Section 02570 Hot Mix Asphalt (HMA)
Page 163 Section 02615 Storm Drainage
Page 167 Section 02735 Vaults & Hatches
Page 171 Section 02990 Landscape Restoration
Page 177 Section 03002 Cast-In-Place Concrete, Reinforcing Steel & Grout
Page 197 Section 04220 Concrete Unit Masonry
Page 209 Section 04230 Masonry Mortaring
Page 213 Section 04240 Masonry Grouting
Page 219 Section 05500 Metal Fabrications
Page 225 Section 06100 Rough Carpentry
Page 229 Section 06170 Prefabricated Wood Trusses
Page 235 Section 06200 Finish Carpentry
Page 237 Section 07210 Building Insulation
Page 243 Section 07410 Metal Roofing System
Page 251 Section 07600 Flashing & Sheet Metal
Page 259 Section 07920 Caulking & Sealants
Page 265 Section 08113 Hollow Metal Doors & Frames
Page 271 Section 08700 Door Hardware
Page 275 Section 09900 Painting
Page 285 Section 10400 Identifying Devices
Page 289 Section 11010 Equipment General Provisions
Page 301 Section 11150 Motors
Page 309 Section 11220 Submersible Well Pump
Page 317 Section 11415 Disinfection System
Page 323 Section 15000 Common Work Results for HVAC & Plumbing
Page 331 Section 15010 General Provisions
Page 341 Section 15060 Pipe
Page 349 Section 15070 Mechanical System Insulation
Page 355 Section 15074 Vibration & Seismic Controls for HVAC
Page 359 Section 15080 Piping Appurtenances
Page 363 Section 15100 Valves
Page 369 Section 15140 Plumbing, Piping & Pumps
Page 377 Section 15390 Hangers & Supports for HVAC Piping & Equipment
Page 383 Section 15410 Plumbing Fixtures & Equipment
Page 389 Section 15710 Decentralized HVAC Equipment
Page 399 Section 16010 Electrical Work - General
Page 417 Section 16041 Vibration & Seismic Controls for Electrical Systems
Page 423 Section 16075 Identification for Electrical Systems
Page 433 Section 16080 Electrical Demonstration
Page 441 Section 16110 Raceways & Boxes for Electrical Systems
Page 457 Section 16120 Conductors & Cables
Page 469 Section 16160 Motor Starters
Page 477 Section 16164 Panelboards
Page 489 Section 16190 Hangers & Supports for Electrical Systems
Page 493 Section 16300 Surge Protective Devices
Page 497 Section 16401 Service Equipment
Page 501 Section 16410 Enclosed Switches
Page 507 Section 16415 Fuses
Page 509 Section 16420 Circuit Breakers
Page 511 Section 16450 Grounding & Bonding for Electrical Systems
Page 515 Section 16460 Low-Voltage Transformers
Page 521 Section 16500 Lighting
Page 527 Section 17050 Common Requirements for Process Instrumentation
Page 535 Section 17113 Magnetic Flow Meters
Page 537 Section 17313 Pressure Gauges
Page 539 Section 17323 Pressure Measurement Devices
Page 541 Section 17463 Temperature Transmitters
Page 543 Section 17505 Multi-Parameter Analyzer Systems
Page 545 Section 17726 Position, Speed & Motion Measurement Devices
Page 547 Appendix A Firgrove Standard Details
Page 575 Appendix B Owner-Furnished Equipment
Page 603 Appendix C Basic Abbreviated Drainage Plan
Page 663 Appendix D Pierce County Permitting Documentation